- Page 3 and 4: CAPACITY REQUIREMENTS OF THE OPTICA
- Page 5 and 6: Book 2Chapter OneInstructions for t
- Page 7 and 8: NGN project on turn-key basis, outs
- Page 9 and 10: 1.12 On completion of the opening f
- Page 11 and 12: 3.4C. Installation and commission w
- Page 13 and 14: adequate circuit breakers shall be
- Page 15 and 16: a. For Softswitch and Media gateway
- Page 17 and 18: iii)iv)PAT team shall check the qua
- Page 19 and 20: The details of this course module a
- Page 21 and 22: at both ends of inter-connecting ca
- Page 23 and 24: 3.1 Brief Description of the Networ
- Page 25: E. Connectivity Matrix of Mirpur Tr
- Page 31 and 32: Book 2Chapter FiveRequirement of So
- Page 33 and 34: Soft-switch should have the capabil
- Page 35 and 36: functionalities accordingly. The de
- Page 37 and 38: 6.5.1 TGW shall provide (as a minim
- Page 39 and 40: Book 2Chapter SevenRequirements of
- Page 41 and 42: up-gradation” Shortage of quantit
- Page 43 and 44: 8.2.8 Facilities shall be provided
- Page 45 and 46: Book 2Chapter NineRequirements of S
- Page 47 and 48: Book 2Chapter TenRequirements of Sy
- Page 49 and 50: d) Identifying the called party num
- Page 51 and 52: 10.2.10 Trunk SupervisionThe system
- Page 53 and 54: 10.9.2 The visual alarm devices sha
- Page 55 and 56: d) The system shall allow interroga
- Page 57 and 58: Absence of this facility shall be r
- Page 59 and 60: f) Incoming Only LineThe system sha
- Page 61 and 62: a) Short Code DialingThe system sha
- Page 63 and 64: Book 2Chapter ElevenRequirements of
- Page 65 and 66: a) Start Time of observationb) End
- Page 67 and 68: Book 2Chapter TwelveRequirements of
- Page 69 and 70: 12.1.1.8 Wide Screen Display PanelT
- Page 71 and 72: g) Routing table managementh) SNMP-
- Page 73 and 74: 12.2.2 The LI facility shall includ
- Page 75 and 76: (This page is intentionally kept bl
- Page 77 and 78: configured on the offered equipment
- Page 79 and 80:
the customer’s interfaces to the
- Page 81 and 82:
ItemCore WrappingCore Filling Mater
- Page 83 and 84:
13.4.5 Splice closures should be ea
- Page 85 and 86:
13.6.18 The offered equipment shoul
- Page 87 and 88:
Equipped subscriber capacity.• Nu
- Page 89 and 90:
3) Work in L2 transparent switching
- Page 91 and 92:
• T.38 faxq) Quality of serviceTh
- Page 93 and 94:
vi)Installation box/pedestal to hou
- Page 95 and 96:
14.3 Optical Distribution Frame (OD
- Page 97 and 98:
Book 2Chapter FifteenRequirements o
- Page 99 and 100:
e) Provisions must be available to
- Page 101 and 102:
Book 2Chapter SixteenCriteria for E
- Page 103 and 104:
16.18 BTCL’s decision to treat an
- Page 105 and 106:
Book 2Chapter SeventeenCriteria for
- Page 107 and 108:
the affected Bidders, or any obliga
- Page 109 and 110:
d. Periodic and Regular checks on t
- Page 111 and 112:
g. Assist BTCL’s personnel in sub
- Page 113 and 114:
Annex-3.1Capacity Requirements of t
- Page 115 and 116:
Uttara SiteATrunk Capabilities1 Num
- Page 117 and 118:
Annex 3.4BCAPACITY REQUIREMENTS OF
- Page 119 and 120:
Annex 3.6CAPACITY REQUIREMENTS OF E
- Page 121 and 122:
Form B.1SUMMARY PRICE FOR SOFT SWIT
- Page 123 and 124:
Form B.3SUMMARY PRICE FOR ACCESS GA
- Page 125 and 126:
Form B.5ASUMMARY PRICE FOR LAN SWIT
- Page 127 and 128:
Form B.6SUMMARY PRICE FOR LI EQUIPM
- Page 129 and 130:
Form B.8SUMMARY PRICE FOR OTHER EQU
- Page 131 and 132:
Form B.10.ASUMMARY PRICE FOR DC POW
- Page 133:
Form B.11SUMMARY PRICE FOR AUXILIAR
- Page 136 and 137:
Form C.3DETAIL LIST AND PRICE FOR A
- Page 138 and 139:
Form C.5ADetail List and Price for
- Page 140 and 141:
Form C.6Detail List and Price for a
- Page 142 and 143:
Form C.8DETAIL LIST AND PRICE FOR A
- Page 144 and 145:
Form C.10ADETAIL LIST AND PRICE FOR
- Page 146 and 147:
Form C.11DETAIL LIST AND PRICE FOR
- Page 148 and 149:
Form D.2DETAIL LIST AND PRICE FOR T
- Page 150 and 151:
Form D.4DETAIL LIST AND PRICE FOR I
- Page 152 and 153:
Form E.2QUOTATION FOR FUTURE ORDER(