11.07.2015 Views

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NGN project on turn-key basis, outside the country of manufacture of the equipment.Failure to provide such certificate shall be treated as “Change of Substance”.If the bidder is a marketing/trading/distribution firm, in that case the experience of themanufacturer/service provider will be considered as the experience of the bidder if hesubmits certificate from the manufacturer/ service provider to carry out designing,drawing, supplying, installing, testing and commissioning of the equipment.1.4.2.2 If the offered Soft Switch and Trunk Gateways are already in operation in BTCL’snetwork, no experience certificate shall be necessary. In such cases the evaluationcommittee shall consider the performance record of the offered equipments in BTCLnetwork.1.4.3 Explanation of Redundancy (whether 1+1 or N+1) of various core elements such ascontrol processor, back plane, storage device, power supply etc. of the soft switch,Trunk Gateway, GPON, Access gateway, Firewall, and LAN Switch. Absence of suchinformation for each item shall be treated as “Major Deviation.”1.4.4 Detail Bill of Quantity (BoQ) of all equipment (up to the detailed level as far aspossible) and services as per formats shown in "Form B"s and “Form C”s withoutmentioning prices. Absence of any Form shall be considered as “Change ofSubstance.” If any form contains any price information, such price information foreach item shall be treated as “Major Deviation.” If the bid price is however, visible inthe submitted document, the bid will contain “Change of Substance.”1.4.5 Detail lists of Spares as per formats shown in "Form D” (with minimum 1 quantity withreplaceable items) without mentioning prices. Absence of such Form shall beconsidered as “Change of Substance.” If the form contains any price information, suchprice information for each item shall be treated as “Major Deviation.”1.4.6 Detail breakdown of the DC power consumption (in Ampere) of various sub systems inbusy-hour at the present equipped capacity.1.4.7 Power consumption (in VA) of all equipment to be connected with Inverter, if any.1.4.8 Detail method of expansion of the Softswitch, Trunk Gateway and AccessGateway equipment from its present capacity to its final capacity.1.4.9 Brochure / Catalog of the Manufacturer, showing model name, country of origin,description and capacities etc., for major equipment namely Soft switch, Trunk Gateway,Access Gateway, Network Management System, GPON, MDU, ONT, SBU, OpticalFiber, HDPE duct and Power system. Downloaded documents from web site (addressmust be given) shall be acceptable provided that the documents contain the requiredinformation.1.4.10 Brochure / Catalog of the Manufacturer, showing model name, country of origin,description and capacities etc., for other items namely LAN Switches, Coaxial Cable,ODF, DDF.1.5. Bidder who will not give any document as per requirement stated in Clause 1.4.6 to1.4.10 above, the bid shall earn penalty points equivalent to a "Major Deviation" foreach of such absent document.1.6. Each set of the “Detail Technical Documents” shall also contain the followingBook 2 :: Tender on Replacement of Old Telephones in Dhaka City Page: 7 of 153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!