COMMERCIAL NEW CONSTRUCTION, LEED CS 2.0 (CORE & SHELL) CERTIFIED GOLDEcoPlex at Centrepark WestLEED CS 2.0 (Core & Shell) Certified Gold4 Story Office Building5 Level Parking Garage1641 <strong>Worth</strong>ington RoadWest Palm Beach, FL 33409Project DescriptionProject: 4 Story Office Building Project: 5 Level Parking GarageDelivery Method: Guaranteed Maximum PriceDelivery Method: Guaranteed Maximum PriceSize: 100,000 SF Size: 152,500 SF, 480 spacesBudget: $11,129,170 Budget: $4,814,751Commencement: 4/2007 Commencement: 4/2006Status: Complete 8/2008 Status: Complete 2/2007USGBC LEED CS 2.0 Certified Gold high-performance <strong>of</strong>fice building with adjacent five-level parking garage with 480spaces, EcoPlex is Palm Beach County’s first Class “A” multi-tenanted green <strong>of</strong>fice building. The <strong>project</strong> incorporatesresource-efficient building and landscaping systems, which rewards businesses with a healthier workplace, maximumenergy efficiency, minimal environmental impact and significant cost savings.OwnerArchitect / Owner’s RepresentativeNavarro Lowrey, Inc.Glidden, Spina & Partners1641 <strong>Worth</strong>ington Road 1401 Forum Way, #100West Palm Beach, FL 33409 West Palm Beach, Florida 33401Frank Navarro, 561-688-2530 Keith Spina, 561-684-6841HB Project TeamArchitect <strong>of</strong> RecordBenjamin Clemens, Vice President OperationsSmith & Moore ArchitectsDave Muir, LEED AP, Superintendent1500 South Olive AvenueJohn Richardson, Asst. Project Manager West Palm Beach, FL 33401John Banting, LEED AP, LEED Coordinator Harold Smith, 561-835-1888Awards••2010 LEED CS Project <strong>of</strong> the Year, USGBC South Florida Chapter2009 Build Florida Award for Sustainable Construction, AGC Florida East Coast Chapter
COMMERCIAL NEW CONSTRUCTION, LEED CS 2.0 (CORE & SHELL) CERTIFIED GOLDSustainable Construction Features• Ro<strong>of</strong> with high SRI to improve energy efficiency.• Rainwater recycling system directs water on the ro<strong>of</strong> and a/ccondensation toward four large cisterns for storage and use insanitary systems.• Lushly landscaped outdoor plaza surrounds a natural waterfiltration system used for the HVAC cooling tower.• Eliminated potable water usage for cooling tower and irrigationthrough use <strong>of</strong> pond water.• Indoor air quality is enhanced through fresh air mechanical systems.• Oversized windows supply abundant natural light.• Integrated air and raised flooring system.• Demountable partitions in conjunction with a raised flooring system enable the adaptability <strong>of</strong> space and increase thelongevity <strong>of</strong> materials.