11.07.2015 Views

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>3.4 Natural gas and oil derivateshere is an underground gas pipeline which in the past supplied the Skopje Iron Factory, Feronikel,fact in this respect is that the Government possesses the land property rights for the Hani i Elezit reducing high rate of annual energy demand growth, which is due mainly to use of electricity for report in May 2008 Regarding development of renewable energy, a pre-feasibility study of small scale sites forright to use water for power generation 5 from <strong>Kosovo</strong> Budget, during 2008 MEM has implemented several pilot solar water heatingUnder the LPTAP, the World Bank (WB) funded the updating of the existing Feasibility Study for HPPreport shows the status of the development of the legal and regulatory framework, institutional setup, and projects and programsMinistry of <strong>Energy</strong> and Mining Faqe 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!