11.07.2015 Views

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>3. Hydropower Plants, generation from HPP Ujmani and other small existing HPPs.b. Electricity import and exchangesc. Development of the new power generation capacities• Construction of TPP Kosova e Re through an open, transparent and competitiveprocess;• Construction of HPP Zhur with concession through an open, transparent andcompetitive process;• Development through concessions of the new small HPPs through an open,transparent and competitive process;• Revitalization of the units of TPP Kosova B; and11.2.1 Further unbundling of KEK JSCUnbundling of the KEK JSC is required by the existing energy legislation in <strong>Kosovo</strong>, obligationsThe Government will ensure that steps are taken to improve the governance of KEK JSC before general upgrading of KEK JSC’s management and management systems and timely submission ofAnticipated stages for the complete unbundling of KEK JSC are:Stage one: During <strong>2009</strong> unbundling of KEK JSC divisions has been carried out as it was providedfor in the 2008 22 Distribution and Supply businesses will be legally separated from KEK JSC into an enterprise, to -Faqe 66Ministry of <strong>Energy</strong> and Mining

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!