11.07.2015 Views

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>of the special zone and the development of all related activities of the Kosova e ReProject; Albania; and 11.2.5 Revitalization of TPP Kosova B with private sector participationthis power plant and somewhat increase its generation capacity, but it will also enable compliance 11.2.6 Modernization of the transmission system and its international integrationPolicies to be implementedThe main objective of this strategy, as far as the transmission system is concerned, is to establish asustainable infrastructure able to handle the increased domestic demand for electricity and enhance investments will improve the reliability of the transmission system, eliminate power transferof <strong>Kosovo</strong>’s interconnections to the regional electricity market is essential for ensuring the security It is essential to develop the transmission infrastructure in line with the criteria that provide forpower exchange constraints with neighboring countries, particularly with Albania through theQuality supply of electricity from the units of the Kosova e Re TPP requires the strengthening ofMinistry of <strong>Energy</strong> and Mining Faqe 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!