11.07.2015 Views

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>electricity tariffs 19 8.4 Electricity generation forecast in <strong>Kosovo</strong> for the period <strong>2009</strong>-<strong>2018</strong>During the entire 1999-2008 period, annual power generation from domestic sources has beenThe forecast of power generation for the period <strong>2009</strong>-<strong>2018</strong> is based on production of electricityfrom TPP Kosova B, TPP Kosova A, HPP Ujman, existing and new small HPPs, HPP Zhur andMeeting of electricity demand is envisaged as follows:(iii)(v)(vii)(viii)line with the European Directive for Large Combustion Plants, the units of TPP 20 period, including completion of investments required to meet emission standardstheir commercial operation for up to 15 more years after rahabilitation,Power generation from Ujmani Hydro Power Plant (HPP), which could withmaintenance and rehabilitation, continue its commercial operations for a long-Power generation from the Zhur Hydro Power Plant, expected to be constructedDuring the 2010-<strong>2018</strong> period, more than 16 SHPPs will be developed, entering existing small hydropower plants will be rehabilitated and returned intoUntil initiation of production in TPP Kosova e Re, coverage of remainingBased on the above assumptions, electricity generation from domestic power generation plants forFaqe 56Ministry of <strong>Energy</strong> and Mining

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!