ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>Expansion of the mine, as continuation of mining in Southwest of Sibovc, will be required during theFigure 28 shows the anticipated lignite production from open cast mines during the next 10-year periodFigure 28: Lignite production during <strong>2009</strong>-<strong>2018</strong>Mton<strong>2018</strong>16141210864<strong>2018</strong>.714.612.610.68 8 87.25.94.23.62<strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 <strong>2018</strong>Prodhimi Bardh/Mirash MtonProdhimi I mihjës se re MtonSource: Long-term balance of Electrical <strong>Energy</strong> in <strong>Kosovo</strong>, <strong>2009</strong>-<strong>2018</strong>, KOSTT JSC.Sector PolicyThe Government is reviewing possible options for reorganization of the lignite mining sectorTherefore, the Government shall develop an adequate regime of revenues for electricity generationon market terms and conditions, and the offered rate of the sum of these taxes shall be among the investments, mainly from the private sector, with the initial support from the <strong>Kosovo</strong> Budget inMinistry of <strong>Energy</strong> and Mining Faqe 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!