11.07.2015 Views

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

Kosovo Energy Strategy 2009-2018 - Ministria e Integrimit

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENERGY STRATEGY OF THE REPUBLIC OF KOSOVO FOR THE PERIOD <strong>2009</strong>–<strong>2018</strong>Table 15: Forecasted demand and generation of electricity<strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 <strong>2018</strong>Demand [GWh]MDS 4994 5226 5418 5621 5834 6059 6295 6500 6715 6939HDS 5299 5929 6662 6898 Generation 4721 4779 4804 4979 5004 4529 6237 8702 10717 11627Balance [GWh]For MDS -273 -447 -614 -642 -830 -1530 -58 2202 4902 4688For HDS -909 -950 -1160 -1893 8.6 Lignite supply for power generation during the period <strong>2009</strong>-<strong>2018</strong>Demand for lignite to supply the existing power plants and the TPP Kosova e Re (with a capacityTable 16: Demand for LigniteIn ’000 tonYear TPP A TPP B TC Kosova e Re Market Total<strong>2009</strong> 0 50 7,2402010 0 7,2602011 0 100 7,2902012 2683 0 110 7,5782013 2683 0 120 7,588 0 130 6,6732015 925 1925 150 7,7852016 0 3625 6050 160 9,835 0 3625 8250 12,046<strong>2018</strong> 0 8250 180 13,015Faqe 58Ministry of <strong>Energy</strong> and Mining

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!