12.07.2015 Views

A Guide to the Repair of Historic Roofs - Dublin City Council

A Guide to the Repair of Historic Roofs - Dublin City Council

A Guide to the Repair of Historic Roofs - Dublin City Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ROOFS A GUIDE TO THE REPAIR OF HISTORIC ROOFSSECRET GUTTERSSecret gutters are concealed channels which runthrough a ro<strong>of</strong> space <strong>to</strong> drain in<strong>to</strong> a parapet gutter ora central well, such as where four internal ro<strong>of</strong> slopesconverge <strong>to</strong> an enclosed area. A secret gutter reliesheavily on <strong>the</strong> fall <strong>of</strong> <strong>the</strong> lead-lined box gutter receiver<strong>to</strong> work effectively. Because <strong>of</strong> <strong>the</strong> inaccessibility <strong>of</strong> asecret gutter, it is prone <strong>to</strong> unnoticed blockages. Agrating <strong>to</strong> prevent bird ingress and blockage fromleaves or debris should be installed and regularmaintenance inspections carried out <strong>to</strong> ensure <strong>the</strong>gutter remains free-flowing. The alternative detail <strong>of</strong>piping <strong>the</strong> secret gutter through <strong>the</strong> ro<strong>of</strong> should beconsidered if carrying out major ro<strong>of</strong> repairs as itmakes this detail significantly less vulnerable <strong>to</strong> leakswithin <strong>the</strong> ro<strong>of</strong> space.Occasionally in terraced buildings, a secret gutter isshared by two adjoining properties and is typicallycarried along <strong>the</strong> <strong>to</strong>p <strong>of</strong> <strong>the</strong> party wall within <strong>the</strong> atticspace. The party walls in terraced houses were <strong>of</strong>tennot built up fully <strong>to</strong> finish beneath <strong>the</strong> ro<strong>of</strong> slope.Therefore many terraced houses are not fullyseparated or independent in terms <strong>of</strong> a structural firebreak at ro<strong>of</strong> level. In re-ro<strong>of</strong>ing a structure, <strong>the</strong>completion <strong>of</strong> <strong>the</strong> party wall <strong>to</strong> achieve a fire break atro<strong>of</strong> level should be considered. Where this is desired<strong>the</strong> internal gutter should be re-routed as twoseparate gutters ei<strong>the</strong>r side <strong>of</strong> <strong>the</strong> extended party wall<strong>to</strong> a detail agreed by both building owners.The term ‘secret gutter’ is also used <strong>to</strong> describe apartially concealed gutter <strong>to</strong> <strong>the</strong> base <strong>of</strong> an abutmen<strong>to</strong>r gable coping. Where <strong>the</strong> ro<strong>of</strong> is being re-slated itspr<strong>of</strong>ile will most likely be increased in height by <strong>the</strong>addition <strong>of</strong> new battens, which are thicker than wereformerly used, or counter battens (an additional layer<strong>of</strong> battens fixed perpendicular <strong>to</strong> <strong>the</strong> first layer <strong>of</strong>battens). The relationship between ro<strong>of</strong> covering andcoping upstand may <strong>the</strong>refore be altered. If <strong>the</strong>re is arisk <strong>of</strong> water penetration below <strong>the</strong> lead flashing, arecessed or secret gutter can be formed if <strong>the</strong> ro<strong>of</strong> iscounter-battened, and an appropriate lead upstandformed <strong>to</strong> <strong>the</strong> coping. These works may materiallyaffect <strong>the</strong> character <strong>of</strong> <strong>the</strong> ro<strong>of</strong>, and <strong>the</strong> architecturalconservation <strong>of</strong>ficer in <strong>the</strong> local authority should beconsulted regarding <strong>the</strong> necessity <strong>of</strong> obtainingplanning permission.A lead-lined, secret gutter within <strong>the</strong> ro<strong>of</strong> space used<strong>to</strong> carry rainwater from an internal ro<strong>of</strong> <strong>to</strong> outfall at<strong>the</strong> eavesThe installation <strong>of</strong> an early warning system in <strong>the</strong>form <strong>of</strong> an overflow pipe will alert <strong>the</strong> owner that <strong>the</strong>catchment pit is full and that a blockage in <strong>the</strong> gutteror hopper head needs <strong>to</strong> be cleared before excessivedamage occurs72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!