(b)(c)(d)three (3) hours after the hour (which is not less than 15 minutes after thetime the Entry Renomination is received by the Transporter), where thedifference between the Renominated Quantity <strong>and</strong> the quantity specifiedin the previous Valid Nomination or Valid Renomination is less thanfifty (50) per cent but greater than or equal to twenty five (25) per cent;two (2) hours after the hour (which is not less than 15 minutes after thetime the Entry Renomination is submitted), where the difference betweenthe Renominated Quantity <strong>and</strong> the quantity specified in the previousValid Nomination or Valid Renomination is less than twenty five (25)per cent; orsix (6) hours after the hour (which is not less than 15 minutes after therelevant Nomination is submitted) where a change <strong>of</strong> physical flowdirection at a Bi-Directional CSP is required.1.8.3 The Renomination Effective Time in respect <strong>of</strong> a Valid CSEP ExitRenomination, Valid Sub-Sea I/C Offtake Renomination <strong>and</strong>/or in respect <strong>of</strong> aValid Renomination at or in respect <strong>of</strong> a LDM Offtake (subject to Section1.8.7) shall be on the hour which is after the expiry <strong>of</strong> the notice period(s)notified by the Transporter to the Shipper from time to time (including pursuantto any applicable End User Agreement) <strong>and</strong> in default <strong>of</strong> any such notice periodbeing specified shall be:(a)(b)(c)(d)five (5) hours after the hour (which is not less than 15 minutes after thetime the Renomination is received by the Transporter) , where thedifference between the Renominated Quantity <strong>and</strong> the quantity specifiedin the previous Valid Nomination or Valid Renomination is greater thanor equal to fifty (50) per cent;three (3) hours after the hour (which is not less than 15 minutes after thetime the Renomination is received by the Transporter), where thedifference between the Renominated Quantity <strong>and</strong> the quantity specifiedin the previous Valid Nomination or Valid Renomination is less thanfifty (50) per cent <strong>and</strong> greater than or equal to twenty five (25) per cent;two (2) hours after the hour (which is not less than 15 minutes after thetime the Renomination is received by the Transporter), where thedifference between the Renominated Quantity <strong>and</strong> the quantity specifiedin the previous Valid Nomination or Valid Renomination is less thantwenty five (25) per cent; orsix (6) hours after the hour (which is not less than 15 minutes after therelevant Nomination is submitted) at a Bi-Directional CSP where achange <strong>of</strong> physical flow direction is required,subject in the case <strong>of</strong> a Valid Renomination at or in respect <strong>of</strong> a LDM Offtaketo the relevant ramp rates, <strong>of</strong>ftake rates <strong>and</strong> Exit Point specific items whichCode <strong>of</strong> Operations Version 3.029Part D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!