12.07.2015 Views

code of operations part d nominations, allocations and ... - Gaslink

code of operations part d nominations, allocations and ... - Gaslink

code of operations part d nominations, allocations and ... - Gaslink

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(a)(b)(c)(d)(e)on a Day on which the Transporter anticipates that there might otherwisebe an adverse impact on Shippers entitlement to use <strong>of</strong> theTransportation System (other than on an Interruptible basis) or anylocalised <strong>part</strong> there<strong>of</strong>;for operational reasons (including non-availability <strong>of</strong> required pressurein the Transportation System or any localised <strong>part</strong> there<strong>of</strong>) or nonavailability<strong>of</strong> the Transporter’s requested pr<strong>of</strong>ile;on a Day in respect <strong>of</strong> which the forecast total system dem<strong>and</strong> isanticipated to be eighty five (85) per cent or more <strong>of</strong> peak dem<strong>and</strong>;on a Day on which the Transporter anticipates there would otherwise bea Restricted Capacity Day or a Difficult Day; <strong>and</strong>/oron a Restricted Capacity Day.The sum <strong>of</strong> the aggregate Daily Interrupted Quantities at the Inch CSEP inrespect <strong>of</strong> all Interruptions pursuant to this Section 1.11.2(a) to (e) during themonths <strong>of</strong> May, June, July, August <strong>and</strong> September in each Gas Year will notexceed the Inch CSEP Nominations Limit multiplied by fifteen (15). TheTransporter may, notwithst<strong>and</strong>ing the foregoing require further Interruptions insuch months in the event <strong>of</strong> a Restricted Capacity Day, in which case theTransporter shall treat the Inch CSEP in the same manner as those LDMOfftakes described at Part H Section 1.9.1(a) <strong>and</strong> apply Part H Section 2.7.1 tothe Inch CSEP Nominations Limit (as if it were Active Capacity) to achieve theAggregate Available Interruptible Nomination Limit at the Inch CSEP.1.11.3 Where the Transporter requires Interruption at a CSEP it shall notify allaffected Shippers by way <strong>of</strong> a notice (“Interruption Notice”). TheInterruption Notice shall include:(a)(b)(c)(d)(e)(f)the location <strong>of</strong> the affected CSEP;the Day or <strong>part</strong> <strong>of</strong> the Day to which the notice relates;the time from which the Interruption shall take effect (the “InterruptionEffective Time”) (which shall be on the hour which is not less than two(2) hours after the Transporter issues the Interruption Notice);the extent <strong>of</strong> the Interruption (which may be expressed as a percentage<strong>of</strong> the relevant CSEP Nominations Limit);the Shipper’s Available Interruptible Exit Nomination Quantity whereapplicable; <strong>and</strong>the Aggregate Available Interruptible Nomination Limit.An Interruption Notice shall specify the Shipper’s Available Interruptible ExitNomination Quantity where:Code <strong>of</strong> Operations Version 3.033Part D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!