2.8.9 The provisions <strong>of</strong> Sections 2.8.1 to 2.8.8 shall apply, mutatis mut<strong>and</strong>is withrespect to the adjustment <strong>of</strong> Sub-Sea I/C Offtake Allocations.2.9 Notification <strong>of</strong> Exit Allocations2.9.1 The Transporter shall make available to Shippers the Initial Exit Allocation inrespect <strong>of</strong> a Shipper’s LDM Offtakes, DM Offtake(s) <strong>and</strong>/or NDM SupplyPoint(s) <strong>and</strong>/or the Sub-Sea I/C Offtake by 16:00 hours on D + 1.2.9.2 The Transporter shall make available to Shippers the Final Exit Allocation inrespect <strong>of</strong> a Shipper's LDM Offtake(s), DM Offtake(s), NDM Supply Point(s)<strong>and</strong>/or the Sub-Sea I/C Offtake by 16:00 hours on D+5.2.10 Supply Point Allocations2.10.1 Initial Supply Point Allocation(s) in respect <strong>of</strong> a LDM Supply Point on a Dayshall be equal to the metered quantity <strong>of</strong> Natural Gas <strong>of</strong>ftaken from that SupplyPoint on such Day or, in the case <strong>of</strong> a Multiple Shipper LDM Supply Point, inaccordance with the procedures contained in Sections 2.7.1 <strong>and</strong> 2.9.2.10.2 Initial Supply Point Allocations in respect <strong>of</strong> DM Supply Points on a Day shallfor each DM Shipper be equal to the metered quantities <strong>of</strong> Natural Gasdetermined as having been <strong>of</strong>ftaken on such Day at each DM Supply Point atwhich the Shipper is registered.2.10.3 Initial Supply Point Allocations in respect <strong>of</strong> NDM Supply Points shall for eachNDM Shipper be determined in accordance with the NDM AllocationProcedure.2.10.4 Where a Shipper considers that an adjustment is necessary to its Initial SupplyPoint Allocation, it shall be entitled to submit a request to the Transporter <strong>and</strong>the Transporter may consider such request in accordance, mutatis mut<strong>and</strong>is,with the provisions <strong>of</strong> Section 2.8.2.10.5 The Transporter shall make available to Shippers the Final Supply PointAllocation at 16:00 hours on D+5.2.10.6 The Transporter may make a Supply Point Reallocation to a Shipper where anadjustment is necessary (including as a result <strong>of</strong> a revision to the meteredquantity <strong>of</strong> Natural Gas <strong>of</strong>ftaken from the Supply Point in respect <strong>of</strong> a Day) inrespect <strong>of</strong> any previous Supply Point Allocation.2.11 IBP Allocations2.11.1 IBP Allocations shall be made available by the Transporter by 16:00 hours onD+1. For the avoidance <strong>of</strong> doubt, IBP Allocations will be final IBP Allocations<strong>and</strong> may not be adjusted.2.12 Bi-Directional CSP AllocationCode <strong>of</strong> Operations Version 3.056Part D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!