12.07.2015 Views

code of operations part d nominations, allocations and ... - Gaslink

code of operations part d nominations, allocations and ... - Gaslink

code of operations part d nominations, allocations and ... - Gaslink

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>and</strong>(b)for each Day <strong>of</strong> the commissioning period following the expiry <strong>of</strong> thefirst three (3) months <strong>of</strong> commissioning the lesser <strong>of</strong>:(i)(ii)the difference between such Shipper’s Final Exit Allocation at theLDM Offtake in respect <strong>of</strong> a Day <strong>and</strong> the Shipper’s prevailing ValidNomination or Valid Renomination in respect <strong>of</strong> such Day; <strong>and</strong>the Exit Tolerance in respect <strong>of</strong> such LDM Offtake in respect <strong>of</strong> theDay as calculated pursuant to Part E (Balancing <strong>and</strong> Shrinkage)Section 1.7.3 multiplied by two (2).1.9.2 The Exit Tolerances specified in Sections 1.9.1(a) <strong>and</strong> 1.9.1(b) are insubstitution for the LDM Exit Tolerances in respect <strong>of</strong> such LDM Offtakespecified in Part E (Balancing <strong>and</strong> Shrinkage) Section 1 (Balancing).1.9.3 If the commissioning extends beyond six (6) Months, the LDM Exit Tolerancein respect <strong>of</strong> the LDM Offtake shall be calculated in accordance with Part E(Balancing <strong>and</strong> Shrinkage) Section 1 (Balancing).1.9.4 The Shipper shall notify the Transporter:(a)(b)at least eight (8) weeks in advance <strong>of</strong> the intended commencement <strong>of</strong> thesaid commissioning period. The Shipper shall provide further notice tothe Transporter four (4) weeks in advance <strong>of</strong> the intended commissioningperiod <strong>and</strong> one (1) week in advance <strong>of</strong> the commencement <strong>of</strong> the saidcommissioning period; <strong>and</strong>forthwith on the completion <strong>of</strong> the said commissioning period.1.10 Plant Trip(s)1.10.1 In the event <strong>of</strong> a Plant Trip affecting a LDM Offtake the Shipper registered atsuch LDM Offtake shall make a Renomination for a reduced amount <strong>of</strong> NaturalGas as soon as possible <strong>and</strong> use reasonable endeavours to ensure suchRenomination is a Valid Renomination; <strong>and</strong> subject to the Shipper havingendeavoured to make a Renomination for a reduced amount <strong>of</strong> Natural Gasaccordingly the Exit Tolerance in respect <strong>of</strong> such LDM Offtake on the Day onwhich such Plant Trip has affected such LDM Offtake shall be the differencebetween the prevailing Valid Exit Nomination or Valid Exit Renomination inrespect <strong>of</strong> such LDM Offtake on the Day <strong>and</strong> the Shipper’s Final ExitAllocation at such LDM Offtake in respect <strong>of</strong> that Day.1.10.2 The Transporter will require documentary evidence <strong>of</strong> the circumstances <strong>of</strong> thePlant Trip in support <strong>of</strong> a requirement that the Shipper shall be entitled to anExit Tolerance in accordance with this Section 1.10.Code <strong>of</strong> Operations Version 3.031Part D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!