12.07.2015 Views

Grand Housing Development Program Volume III - Gtz

Grand Housing Development Program Volume III - Gtz

Grand Housing Development Program Volume III - Gtz

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERNAL STAIRCASE(CONTINUED)The renewedhandrail’s postis mounted andenclosed by aconcrete basis.While casting theconcrete a spaceto the upper levelof the step is left(approx. 2,5 cm).The space is filledwith a mixtureout of mortar andmarble chips.Fixture of the old handrail at the lowest point. A part of thelast step is broken and missing.After curing thesurface can begrinded and polished.The result looksquite similar to theoriginal terrazzosteps.The mixture of mortar and marble chippings.The original terrazzosteps arecleaned with amixture of waterand acid.The ceramic skirting board is mounted.52Addis AbabaCity Government

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!