LAYING THE PARQUETTo work quickly,a package of theplanks is laid outand prepared withglue from oneside...(CONTINUED)... and laid directly onto the cement screed or chipwoodboard, facing with the glueing side downwards.After sandinguneven levels areremoved and theparquet’s surface issmooth.Also old paint anddirt are removed asit can be seen atthe inner part of theparquet floor on thepicture.Within door openings, special ornaments are laid. Rabbetsare filled with resin filler.The parquet after second sanding and impregnation. Polishingwill be the final step.The parquet after polishing.- Impregnation and mounting skirting boards- Polishing60Addis AbabaCity Government