12.07.2015 Views

Project Management Guidelines - National Transport Authority

Project Management Guidelines - National Transport Authority

Project Management Guidelines - National Transport Authority

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final <strong>Project</strong> ReportSummary of <strong>Project</strong> InformationItemDescription<strong>Project</strong> Name Cycle Network Development – Route 6Local <strong>Authority</strong>NTA <strong>Project</strong> TypeNTA <strong>Project</strong> ReferenceNumberLeinster County CouncilCycling / Walking2011/LCC/WALK_CYC/003<strong>Project</strong> DetailsLeinster County Council proposes to deliver a cycle and pedestrian linkthrough the Council-owned Farmstead Park, linking the local school andGAA sports ground to the town.Planning Approvals Required Part VIIIDesigned byINFUTURE DESIGNSConstructed byPMG ConstructionScheme Budget €497,950NTA % of Funding 100%Final Outturn €477,500IntroductionThe project consists of a new cycle and pedestrian link through a Council-owned park, to connect to anexisting secondary school which is located at the periphery of the town, adjacent to a sports ground. Thelink serves two key destinations – access to the school for the pupils, and access to the GAA grounds froma substantial portion of the town. Scoping of the project (with the NTA) began in January 2011 and theproject was completed in October 2011.87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!