31-1/2''Assembly InstructionsFig. 25NOTE:Secure 2'' x 4'' BoardFrom Outside BarrierFig. 26(3)2-1/2'' screwsper joint(2)1-1/2'' deck screwsper joint3/4'' Gap5/4'' x 4'' x 36''2'' x 4'' x 36''5/4'' x 4'' x 47-1/2''3/4'' Gap(3) 5/4'' x 4'' x 36''5/4'' x 4'' x 20-3/4''(5)2-1/2'' screws(2)1-1/2'' deck screwsper jointNOTE: There must be a 2-1/4''Nominal Gap between allbarrier boards.Barrier Boards cont.1-1/2'' screw1. Install support boards as shown in (Fig. 25).2. Install barrier boards spaced to create openings asshown in (Fig. 26).2-1/2'' screw30