12.07.2015 Views

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item<strong>National</strong>Average(Comp %)Achievementby <strong>the</strong> <strong>State</strong>(Comp %)Remarks by MHRD and reply by <strong>the</strong> <strong>State</strong> during reviewACR 72 54 PAB is to be met by <strong>the</strong> <strong>State</strong>. He mentioned that <strong>the</strong> works which are in progressDW 93 53 will be completed early. He was informed that <strong>the</strong> gap in ACR is high andToilets 69 55enquired how <strong>the</strong> <strong>State</strong> is going to cover <strong>the</strong> gap. He was informed that 227drinking water & 430 toilets are in progress. He replied that due to panchayatelections etc <strong>the</strong> progress is delayed and will be completed before <strong>the</strong> next quarter.He was asked to send <strong>the</strong> feedback and an interim report on <strong>the</strong> progress, actiontaken to complete <strong>the</strong> work, likely date for completion action plan for <strong>the</strong> coverage<strong>of</strong> gaps in infrastructure to become RTE compliance to MHRD. This will bespecially reviewed in <strong>the</strong> next review meeting.GujaratBRC 91 98CRC 92 99Shri. Vipin Shah, SPE, Gujarat mentioned that all <strong>the</strong> physical & financial targets(PS, ACR, toilet etc) need reconciliation and <strong>the</strong> <strong>State</strong> will come forPS 81 95reconciliation/re-appropriation within 15 days. He mentioned that for allUPS 88 0sanctioned works funds have been released. Regarding <strong>the</strong> provision <strong>of</strong> waterACR 72 73supply, availability <strong>of</strong> water is a problem. He was informed that updated figuresDW 93 113have not been used in <strong>the</strong> report and only March information is furnished.Toilets 69 49HaryanaBRC 91 117 Shri. A.K. Sethi, Executive Engineer, SSA Haryana mentioned that in case <strong>of</strong> PSCRC 92 99PS 81 85UPS 88 82ACR 72 79DW 93 88Toilets 69 88buildings land is a problem and in few cases court cases are <strong>the</strong>re. Regarding UPSbuildings he was informed that more than 180 are in progress and more than 60are not taken up. He informed that and additional funds are required to complete<strong>the</strong> works as <strong>the</strong> unit cost has increased over <strong>the</strong> period <strong>of</strong> time. He was informedthat any additional fund required due to cost escalation etc. is to be borne by <strong>the</strong><strong>State</strong>. Regarding ACR he mentioned that 2012-13 targets included and all workswill be started early. He was informed that regarding <strong>the</strong> provision <strong>of</strong> drinkingwater 40 are in progress and 694 are not started. Regarding <strong>the</strong> provision <strong>of</strong> toiletshe mentioned that all will be completed by December 2012.Himachal PradeshBRC 91 98 Shri. Rupan Seighal, <strong>State</strong> Project Engineer was informed that <strong>the</strong> ParliamentaryCRC 92 95 Committee has commented on <strong>the</strong> progress <strong>of</strong> PS and UPS buildings arePS 81 3 low/slow and <strong>the</strong> <strong>State</strong> should take immediate action to complete <strong>the</strong>se buildings.UPS 88 0 He replied that as per <strong>the</strong> school mapping exercises carried out by <strong>the</strong> <strong>State</strong> someACR 72 83 <strong>of</strong> <strong>the</strong> targets approved earlier for PS and UPS buildings are not required andDW 93 98 need to be surrendered. The <strong>State</strong> was requested to verify <strong>the</strong> figures and to takenecessary action if <strong>the</strong>se are to be surrendered. Regarding ACRs he mentionedthat all <strong>the</strong> works which are in progress (1377) are above plinth level and will becompleted by December 2012. Districts are sanctioning <strong>the</strong> projects and <strong>the</strong>se willbe started early. He was informed that <strong>the</strong> progress <strong>of</strong> drinking water & toilets isToilets 69 76 low. He informed that due to land slide <strong>the</strong> works are held up and will beexpedited. Regarding provision <strong>of</strong> toilets he mentioned that progress will be madein <strong>the</strong> next quarter. He promised to carry out reconciliation/re-appropriation and<strong>the</strong> correct figures relating to physical and financial targets will be reflected in <strong>the</strong>next quarter report.JharkhandBRC 91 98 Shri. Rattan Srivastava, <strong>State</strong> Project Engineer was informed that in case <strong>of</strong> PSCRC 92 97PS 81 94UPS 88 93ACR 72 54DW 93 93Toilets 69 59more than 600 buildings are not started and enquired <strong>the</strong> reasons for not starting<strong>the</strong> work. He mentioned that 183 buildings are not started for all <strong>the</strong> remainingei<strong>the</strong>r land is not available or <strong>the</strong>y fall in LWE area. Similar is <strong>the</strong> case with UPSbuildings also. All works which are in progress are above lintel level. He wasinformed that <strong>the</strong> progress in ACR is low. SPE mentioned that fund has beentransferred to VEC/SMCs in July 2012 and wherever space is a constraint verticalexpansion has been planned. Regarding provision <strong>of</strong> toilets he mentioned that7000 were approved during 2012-13 and sanctions were given in July 2012and allworks are in progress. Regarding provision <strong>of</strong> drinking water all <strong>the</strong> 201 workswhich are in progress are almost completed and <strong>the</strong> works which are not taken upare from 2012-13 and <strong>the</strong>se will be taken up after September 2012.KarnatakaBRC 91 100 Shri. Krishne Gowde, SPE, SSA Karnataka was informed that 3 PS buildings are inCRC 92 100 progress and 4 are not taken up. <strong>State</strong> should make efforts to complete <strong>the</strong> works.PS 81 100 Regarding UPS, SPE mentioned that all works which are not started by2012-13.UPS 88 0 Regarding ACR he mentioned that 2718 are in progress and 5675 ACR which areACR 72 85 not started are from 2012-13. 2718 in progress rooms will be completed withinDW 93 99 three months. Regarding DW and toilets he mentioned that works which are notToilets 69 100taken up are from 2012-13.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!