12.07.2015 Views

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

estimate and it varies from place to place and according to number <strong>of</strong>children. 634 toilets have been constructed under TSC and Rs.35000/-is received from <strong>the</strong>m. The remaining cost is funded by <strong>the</strong> <strong>State</strong> forwhich <strong>the</strong> decision has been taken by <strong>the</strong> <strong>State</strong>. About a question raisedby a participant regarding <strong>the</strong> schools having more no <strong>of</strong> rooms hementioned that such type <strong>of</strong> schools are less and according toenrollment no <strong>of</strong> rooms are added. Regarding provision <strong>of</strong> play groundat ro<strong>of</strong> level <strong>the</strong> structural consultants are consulted. Designs areprepared at district level and are approved at SPO level.Regarding quality control he mentioned that in house engineers carryout quality control aspects and <strong>the</strong>y have 2 engineers per block and 45sites are looked after by one engineer. For block engineers <strong>the</strong>y payRs.22000/- and Rs.25000/- to district project engineer as salary. Apartfrom <strong>the</strong> above <strong>the</strong>y have third party engineers who also look afterquality control. 12 agencies are working in <strong>the</strong> <strong>State</strong> as third partyconsultants in <strong>the</strong> <strong>State</strong>. For 2012-13 tenders are invited for TPE.Regarding implementation he mentioned that upto 4 classrooms areconstructed by SMCs and bigger works and multilevel constructionactivities are carried out through contractors. For 2012-13 15000 roomsare approved and out <strong>of</strong> <strong>the</strong> above 11000 are to be constructed throughSMCs and <strong>the</strong> remaining 4000 through contractors. For construction <strong>of</strong>load bearing wall work bricks having crushing strength <strong>of</strong> 50-55kg isused and <strong>the</strong> bricks are tested by <strong>the</strong> TPE consultants. He mentionedthat since <strong>the</strong> <strong>State</strong> is falling in III, IV and V zone 12 mm dia cornerrods are used in brick work and upto G+2 load bearing wall is used.Shri. Manoj Kumar Mathur assistant engineer requested for a letterfrom MHRD for suggested staffing pattern to be followed by <strong>the</strong> <strong>State</strong>s.Shri. S.C. Girotra mentioned that this was given in <strong>the</strong> guidelines forimplementation and was followed up with letters from MHRD. A copy<strong>of</strong> <strong>the</strong> letter circulated in <strong>the</strong> meeting regarding <strong>the</strong> systemic7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!