12.07.2015 Views

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item<strong>National</strong>Average(Comp %)Achievementby <strong>the</strong> <strong>State</strong>(Comp %)Remarks by MHRD and reply by <strong>the</strong> <strong>State</strong> during reviewACR 72 83 completion stage and not such works are having land problem. Shri. S.C. GirotraDW 93 104 mentioned that <strong>the</strong>re is a difference in <strong>the</strong> targets approved by PAB and <strong>the</strong>Toilets 69 92targets shown by <strong>the</strong> <strong>State</strong> in case <strong>of</strong> CRC, PS, UPS, ACR, drinking water andtoilets and allocations.RajasthanBRC 91 99 Shri. Maninder Jit Singh, Technical <strong>of</strong>ficer, SSA Rajasthan mentioned that all notCRC 92 96 started PS, UPS and ACRs are from 2012-13. All <strong>the</strong> ongoing ACRs, drinkingPS 81 98 water will be completed by September 2012. He was informed that <strong>the</strong> targetUPS 88 99 approved for toilet is to be reconciled. He was informed that this information hasACR 72 90 to be checked and <strong>the</strong> data has to be finalized. CRC and toilet target has is to beDW 93 99 reconciled.Toilets 69 97SikkimBRC 91 100CRC 92 101PS 81 113 Ms. Amigiri, Assistant Engineer, SSA Sikkim was informed that <strong>the</strong> targetsUPS 88 18 relating to PS, UPS, ACR, DW and toilets need reconciliation. The <strong>State</strong> was alsoACR 72 114 informed to send <strong>the</strong> latest report with financial progress.DW 93 83Toilets 69 83Tamil NaduBRC 91 100CRC 92 100Mr. Sudhakar, <strong>State</strong> Engineer was informed that <strong>the</strong>y should expedite <strong>the</strong>PS 81 98progress <strong>of</strong> PS and UPS buildings as <strong>the</strong>y are in under progress stage. There is aUPS 88 99difference in targets approved by PAB and shown by <strong>State</strong> in case <strong>of</strong> ACR andACR 72 84drinking water and toilets. These have to be reconciled early.DW 93 82Toilets 69 71TripuraBRC 91 100 Shri. Parimal Das, Civil Works Coordinator was informed that 34 PS are notCRC 92 100 started. He informed that <strong>the</strong> not started works are from 2012-13. SPE mentionedPS 81 98 that 934 ACRs sanctioned during 2012-13. Regarding drinking water heUPS 88 99 mentioned that 14 in progress are nearing completion. He was informed <strong>of</strong> <strong>the</strong>ACR 72 77 low progress for toilets. He replied that SSA funds have been transferred to PHEDDW 93 98 for carrying out works and <strong>the</strong>y are taking more time in implementation. He wasinformed to take up <strong>the</strong> issue with <strong>the</strong> concerned department to complete <strong>the</strong>mToilets 69 54immediately.Uttar PradeshBRC 91 92CRC 92 99Ms. Anu Rathi, Civil Works Coordinator informed that <strong>the</strong> progress <strong>of</strong> PS andUPS were not started due to shortage <strong>of</strong> funds as <strong>the</strong>se were approved inPS 81 73supplementary plan for 2011-12. Now funds have been received in <strong>the</strong> month <strong>of</strong>UPS 88 96July2012 and <strong>the</strong> works have been started. Regarding drinking water sheACR 72 92mentioned that <strong>the</strong> problem is mainly due to <strong>the</strong> rocky terrain area where <strong>the</strong> boreDW 93 82wells are to be drilled. Un started toilets are from <strong>the</strong> sanctions <strong>of</strong> 2012-13.Toilets 69 70UttarakhandBRC 91 100 Shri. V.K. Verma, Executive Engineer, SSA Uttarakhand was informed that 276 PSCRC 92 99 and 122 UPS buildings are in progress. Shri. V.K. Verma replied that PS buildingsPS 81 77 which are in progress are from 2012-13 and UPS targets have been reconciled andUPS 88 86 to be included in <strong>the</strong> report. He added that all are in finishing stage. ThoseACR 72 80 buildings which are falling in forest area will be completed within three months.DW 93 99 He mentioned that targets <strong>of</strong> 2008-09 are to be surrendered. ACRs will becompleted within two/three months. Regarding drinking water and toilets heToilets 69 69mentioned that all have been completed.West BengalBRC 91 96 Shri. Sudhashil Mandal, <strong>State</strong> Project Engineer, WB was informed <strong>of</strong> <strong>the</strong> progressCRC 92 76PS 81 51UPS 88 16ACR 72 61DW 93 80Toilets 69 48under civil works SPE replied that 43 PS completed during 1 st quarter and 2012-13works have not started. Land for construction has been identified. Regarding UPSbuilding he was informed that <strong>the</strong> progress is low and <strong>the</strong> target needreconciliation. SPE replied that PR is implementing <strong>the</strong> works relating toSSK/MSK. During 2012-13 about 55000 was approved and about 50% will becompleted by December 2012. Regarding drinking water and toilets he mentionedthat all <strong>the</strong> ongoing works will be completed by December 2012.About 25000 toiletunits have been approved during 2012 -13 and funds have been released.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!