12.07.2015 Views

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

1 Minutes of the 28th National workshop/ Review Meeting of State ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Item<strong>National</strong>Average(Comp %)Achievementby <strong>the</strong> <strong>State</strong>(Comp %)Remarks by MHRD and reply by <strong>the</strong> <strong>State</strong> during reviewKeralaBRC 91 85CRC 92 62Shri. P.R. Mohanakumar, SPE mentioned that for 38 PS buildings <strong>State</strong> hasidentified land and for <strong>the</strong> remaining land is a problem. Regarding UPS SPEPS 81 39mentioned that for 12 buildings land is a problem. SPE informed that schools areUPS 88 0running in rented buildings. Regarding ACR he mentioned that 378 rooms will beACR 72 95completed by October/November 2012. Regarding <strong>the</strong> provision <strong>of</strong> toilets &DW 93 100drinking water he mentioned that all <strong>the</strong> approved targets have been completed.Toilets 69 91Madhya PradeshBRC 91 94CRC 92 100Shri. A.K. Choudhary, Chief Engineer mentioned that 539 PS buildings are inprogress and are up to lintel level and <strong>the</strong> buildings which are started are fromPS 81 972012-13. Budget for <strong>the</strong> works have been allocated. Regarding UPS buildingsUPS 88 87most <strong>of</strong> <strong>the</strong> buildings which are not started are from 2012-13 approvals. RegardingACR 72 72<strong>the</strong> provision <strong>of</strong> toilets and drinking water he mentioned that all works will beDW 93 97completed by November/ December 2012.Toilets 69 91MaharashtraBRC 91 96 <strong>State</strong> was informed that <strong>the</strong> ongoing works <strong>of</strong> PS and UPS buildings should beCRC 92 99 completed. Regarding PS buildings Shri. Mahesh Bhokare, Deputy EngineerPS 81 87 mentioned that certain targets have been surrendered and <strong>the</strong> minutes areUPS 88 82 awaited. He informed that <strong>the</strong> works relating to <strong>the</strong> provision <strong>of</strong> drinking waterACR 72 73 will be completed within <strong>the</strong> next quarter. Regarding <strong>the</strong> provision <strong>of</strong> toilets <strong>the</strong>DW 93 83 <strong>State</strong> has proposed to surrender some <strong>of</strong> <strong>the</strong> targets as <strong>the</strong>y are not required by <strong>the</strong>districts. A certificate to this effect has been given by <strong>the</strong> ZP etc. He was advised toToilets 69 31 check up <strong>the</strong> actual requirement <strong>of</strong> toilets based on enrollment beforesurrendering <strong>the</strong> targets.MizoramBRC 91 84 Shri. Azaria Laltinkima, SPE was informed <strong>the</strong> <strong>State</strong> Government is reportingCRC 92 100PS 81 81UPS 88 85ACR 72 95DW 93 99Toilets 69 95NagalandBRC 91 88CRC 92 0PS 81 22UPS 88 15ACR 72 90DW 93 93Toilets 69 73Odishadifferent targets approved from <strong>the</strong> PAB and was requested to reconcile <strong>the</strong> same.He mentioned that <strong>the</strong> works <strong>of</strong> <strong>the</strong> 2012-13 approvals have not been started.Regarding provision <strong>of</strong> toilets and drinking water SPE mentioned that freshapprovals pertaining to 2012-13 has not been started. He was informed that <strong>the</strong>physical progress reported (94%) is not commensurating with <strong>the</strong> financialprogress reported (60%).The <strong>State</strong> was informed about <strong>the</strong> low achievement/slow progress. Works relatingto <strong>the</strong> provision <strong>of</strong> toilet and drinking water should be completed immediatelyand this will be reviewed in <strong>the</strong> next meeting. . He was informed that <strong>the</strong> physicalprogress reported (78%) is not commensurating with <strong>the</strong> financial progressreported (48%). The civil works coordinator replied that VECs are taking loan andcompleting <strong>the</strong> works and this is reimbursed as and when <strong>the</strong> funds are received.BRC 91 64 The <strong>State</strong> was informed that 722 PS buildings are in progress and many are notCRC 92 86 started. Shri. Nirmal Kumar Das SPE, SSA Odisha mentioned that 230 PSPS 81 79 buildings and 276 UPS buildings are not started due to reasons such as LWE area,UPS 88 111 non availability <strong>of</strong> land and court cases. He was informed that about 19000 ACRsACR 72 66 are not started..SPE mentioned that out <strong>of</strong> 19000 ACRs 15000 rooms are from freshDW 93 79 approvals <strong>of</strong> 2012-13. Regarding provision <strong>of</strong> drinking water he was informed that5652 are in progress, SPE informed that all <strong>the</strong> works which are in progress will becompleted by September 2012. He was informed that <strong>the</strong> progress <strong>of</strong> toilets isslow and 2783 are in progress. SPE mentioned that more than 2000 are from spillover works and <strong>the</strong> remaining are from fresh works approved during 2012-13.Regarding reconciliation <strong>of</strong> targets Shri. C. Ganapathy, Senior ConsultantToilets 69 21 mentioned that for most <strong>of</strong> <strong>the</strong> items targets approved by PAB and <strong>the</strong> targetshown by <strong>the</strong> <strong>State</strong> are not matching as <strong>the</strong> <strong>State</strong> had carried out additional worksby reallocating <strong>the</strong> targets approved by PAB. The <strong>State</strong> had sent a proposal forreconciliation <strong>of</strong> targets to MHRD and this has been examined by TSG. MHRD hasinformed that a team will go to <strong>the</strong> <strong>State</strong>/district to find out <strong>the</strong> fact and to finalise<strong>the</strong> report.PunjabBRC 91 99 The <strong>State</strong> was informed to reconcile <strong>the</strong> targets <strong>of</strong> PS and UPS. Regarding <strong>the</strong>CRC 92 100 progress <strong>of</strong> ACRs Shri. Swaranjit Singh, Xen SSA, Punjab mentioned that for <strong>the</strong>PS 81 85 works sanctions have been issued and <strong>the</strong> works are in progress. RegardingUPS 88 97 provision <strong>of</strong> toilets he mentioned that all <strong>the</strong> works which are in progress are in13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!