- Page 1 and 2: DELHI TRANSCO LIMITED(A Government
- Page 3 and 4: SECTION - IINVITATION FOR BID (IFB)
- Page 5 and 6: xii. Any equipment required for pro
- Page 7 and 8: SECTION-IIINSTRUCTION TO BIDDERS (I
- Page 9: E. Bid Opening and Evaluation19 Ope
- Page 13 and 14: discretion, extend the deadline for
- Page 15 and 16: covered under this package as detai
- Page 17 and 18: listed in Attachment 6 and 6A for P
- Page 19 and 20: 10.3 Bidders shall give a breakdown
- Page 21 and 22: (f)(g)(h)The bidder shall include t
- Page 23 and 24: (c)(d)(e)If the bidder does not acc
- Page 25 and 26: Do not open before 11.30 Hrs on 09.
- Page 27 and 28: as proof of their attendance.In the
- Page 29 and 30: (iii)(iv)(v)Performance Security: C
- Page 31 and 32: 24.5 The Employer's evaluation of B
- Page 33 and 34: Deviation Schedules of Bid Form, Pr
- Page 35 and 36: Employer deems necessary and approp
- Page 37 and 38: notification of award will constitu
- Page 39 and 40: Annexure-AQualification of the Bidd
- Page 41 and 42: 1.1.2 Experience for Erection, Test
- Page 43 and 44: 4. The Collaborator/Parent Company/
- Page 45 and 46: Each of the other partner(s) shall
- Page 47 and 48: 4.0 No margin of preference will be
- Page 49 and 50: Annexure D-2CONSENT LETTER FROM GIS
- Page 51 and 52: SECTION-IIICONDITIONS OF CONTRACT (
- Page 53 and 54: F. Guarantees and Liabilities26 Com
- Page 55 and 56: "Contractor" means the person(s) wh
- Page 57 and 58: structurally and put in a tight and
- Page 59 and 60: is in writing, is dated, expressly
- Page 61 and 62:
6. Settlement of Disputes6.1. Adjud
- Page 63 and 64:
maintenance of the Facilities for t
- Page 65 and 66:
9.6 The Contractor shall permit the
- Page 67 and 68:
12.4 All payments shall be made in
- Page 69 and 70:
All banks except Public Sector Bank
- Page 71 and 72:
15.1 The copy right in all drawings
- Page 73 and 74:
the Employer or the Project Manager
- Page 75 and 76:
planned percentage completion for e
- Page 77 and 78:
CC sub-Clause 20.3.2 through 20.3.7
- Page 79 and 80:
Equipment and the Contractor's Equi
- Page 81 and 82:
21.6 Packinginspection report & tes
- Page 83 and 84:
labour.22.2 Contractor's Equipment2
- Page 85 and 86:
Construction of Buildings, Roads, R
- Page 87 and 88:
maintaining and restoring of wholes
- Page 89 and 90:
occupiers of adjacent property and
- Page 91 and 92:
found to be executed in accordance
- Page 93 and 94:
25.1.2 The Employer shall unless ot
- Page 95 and 96:
the Facilities or that part thereof
- Page 97 and 98:
(c) normal wear and tear.The Defect
- Page 99 and 100:
8 (Functional Guarantees) to the Co
- Page 101 and 102:
expenses, which the Contractor may
- Page 103 and 104:
Facilities executed, notwithstandin
- Page 105 and 106:
Covering physical loss or damage to
- Page 107 and 108:
esponsibilities under the Contract.
- Page 109 and 110:
lack of usual means of public trans
- Page 111 and 112:
38.4 Notwithstanding anything conta
- Page 113 and 114:
prices are inequitable, the parties
- Page 115 and 116:
items for which no additional payme
- Page 117 and 118:
with CC Clause 39 (Change in the Fa
- Page 119 and 120:
d. Costs incurred by the Contractor
- Page 121 and 122:
the Facilities itself or by employi
- Page 123 and 124:
Equipment as of the date of termina
- Page 125 and 126:
44.4 It is further expressly unders
- Page 127 and 128:
CONTENTSFORFORMS AND PROCEDURESSECT
- Page 129 and 130:
1. BID FORMPlease Refer Volume III_
- Page 131 and 132:
limit(i) to sign the Contract Agree
- Page 133 and 134:
N.B. The Letter of Credit should no
- Page 135 and 136:
een issued subsequently)(iii)Clarif
- Page 137 and 138:
us, as per the performa enclosed wi
- Page 139 and 140:
..dated .............. (Delete if n
- Page 141 and 142:
5. FORM OF CONTRACT AGREEMENTTHIS C
- Page 143 and 144:
Payment) hereto.Article 3.Effective
- Page 145 and 146:
APPENDICESAppendix 1Appendix 2Appen
- Page 147 and 148:
The bank guarantee(s) for advance s
- Page 149 and 150:
the Employer’s site (sale-in-tran
- Page 151 and 152:
APPENDIX 3INSURANCE REQUIREMENTSIns
- Page 153 and 154:
Insurances to be taken out by the E
- Page 155 and 156:
APPENDIX 5LIST OF APPROVED SUBCONTR
- Page 157 and 158:
APPENDIX - 7LIST OF DOCUMENTS FOR A
- Page 159 and 160:
6. PERFORMANCE SECURITY FORM(For Bi
- Page 161 and 162:
Date………………………….
- Page 163 and 164:
Authorized SignatureSignature of Wi
- Page 165 and 166:
This Guarantee shall remain in full
- Page 167 and 168:
9. FORM OF OPERATIONAL ACCEPTANCE C
- Page 169 and 170:
CHANGE ORDER PROCEDURE1. GeneralThi
- Page 171 and 172:
6. Reference drawings and /or techn
- Page 173 and 174:
5. Cost for Preparation of Change P
- Page 175 and 176:
[ANNEXURE 4]CHANGE PROPOSAL……
- Page 177 and 178:
13. Other Terms and Conditions of t
- Page 179 and 180:
[ANNEXURE 6]PENDING AGREEMENT CHANG
- Page 181 and 182:
……………………………
- Page 183 and 184:
(ii)The contractor shall attach a c
- Page 185 and 186:
SCHEDULEParticulars of Quantity Par
- Page 187 and 188:
y DTL. The contractor undertakes to
- Page 189 and 190:
REF. No.TO,DATE:M/s……………
- Page 191 and 192:
Ref No……………………..Dat
- Page 193 and 194:
for and on behalf of thePartners of
- Page 195 and 196:
NOW THIS INDENTURE WITNESS AS UNDER
- Page 197 and 198:
18. PROFORMA OF JOINT UNDERTAKING B
- Page 199 and 200:
2. ----------------------- Signatur
- Page 201 and 202:
i. e xeVOLUME - IITECHNICAL SPECIFI
- Page 203 and 204:
i. e xeSECTION IPROJECT1.0 General1
- Page 205 and 206:
(A)(B)(C)Sectionalized Double bus b
- Page 207 and 208:
10) GIS Cable termination enclosure
- Page 209 and 210:
alongwith associated equipments and
- Page 211 and 212:
2.6.9 New SF6 Gas handling equipmen
- Page 213 and 214:
commissioning of substation shall b
- Page 215 and 216:
schedule provided in the BPS. All s
- Page 217 and 218:
The metal-enclosed gas insulated sw
- Page 219 and 220:
prevent uncontrolled bursting of pr
- Page 221 and 222:
4.18 All the elements shall be acce
- Page 223 and 224:
4.35.2 Operating System:a) Low oper
- Page 225 and 226:
8.0 Pressure Vessel RequirementsThe
- Page 227 and 228:
The breaker shall satisfactorily wi
- Page 229 and 230:
local/remote selector switch and cl
- Page 231 and 232:
10.7.2 Routine TestsRoutine tests a
- Page 233 and 234:
at 156 kV (Microvolts)r) Max. diffe
- Page 235 and 236:
able to withstand starting torque o
- Page 237 and 238:
12.3 Each safety grounding switch s
- Page 239 and 240:
Where multi-ratio current transform
- Page 241 and 242:
terminated to the stud type non-dis
- Page 243 and 244:
D) Mechanical forces on bushing ter
- Page 245 and 246:
the same. Additional routine/functi
- Page 247 and 248:
SF6 gas shall be tested for purity,
- Page 249 and 250:
control of electrical field in the
- Page 251 and 252:
TABLE-IIARequirement Of 33kv Voltag
- Page 253 and 254:
2.5 Equipment furnished shall be co
- Page 255 and 256:
4.7.1 System ParameterS.NO Descript
- Page 257 and 258:
(B) FOR CT/VT/SA 36 kVRated voltage
- Page 259 and 260:
5.6 All manufacturing and fabricati
- Page 261 and 262:
5.9 The major drawing as per Annexu
- Page 263 and 264:
6.1.7 All oil, grease and other con
- Page 265 and 266:
conditions under which the item of
- Page 267 and 268:
(f) Control of non-conforming items
- Page 269 and 270:
attend such tests within thirty (30
- Page 271 and 272:
submit packing details/associated d
- Page 273 and 274:
12.3.2 After phosphating, thorough
- Page 275 and 276:
same to Contractor and there upon i
- Page 277 and 278:
17.2 Each equipment shall be suppli
- Page 279 and 280:
cracked during the ten years of ope
- Page 281 and 282:
in place of stud type terminals. Bu
- Page 283 and 284:
e adequately shrouded. Fuses shall
- Page 285 and 286:
point and the motor shall not be ov
- Page 287 and 288:
or above class, based on technologi
- Page 289 and 290:
proven design. At least one hundred
- Page 291 and 292:
LIST OF SPECIFICATIONSANNEXURE - B1
- Page 293 and 294:
2. GAS INSULATED METAL-ENCLOSED SWI
- Page 295 and 296:
NEMA-SG-6 Power switching Equipment
- Page 297 and 298:
IEC-60120 Dimensions of Ball and So
- Page 299 and 300:
IEEE-484Recommended Design for inst
- Page 301 and 302:
24. PIPING VALVES & SPECIALITIESIS:
- Page 303 and 304:
IS:2878IS:2171IS:94027. D.G. SETIS:
- Page 305 and 306:
and sewage.IS-6392 Steel pipe flang
- Page 307 and 308:
80 (4.5 kg) rame land 18-in. (457 m
- Page 309 and 310:
areas.IS:800 Code of practice for u
- Page 311 and 312:
ANNEXURE - CLIST OF DRAWINGS/DOCUME
- Page 313 and 314:
SECTION: IVSPECIFIC EQUIPMENTSTECHN
- Page 315 and 316:
attery pack with charger suitable f
- Page 317 and 318:
11. The programmable/automatic Rela
- Page 319 and 320:
(v) The CB Analyzer should be capab
- Page 321 and 322:
___________________________________
- Page 323 and 324:
The entire fire protection system s
- Page 325 and 326:
SECTION-VI: LT SWITCHGEARTECHNICAL
- Page 327 and 328:
horizontal run of busbar minimum cl
- Page 329 and 330:
1.3.4 All busbars shall be adequate
- Page 331 and 332:
continuously carrying and breaking
- Page 333 and 334:
1.6.3 MCCBs shall be provided with
- Page 335 and 336:
1.10.1 All indicating and integrati
- Page 337 and 338:
1.14.2 Lamps shall have translucent
- Page 339 and 340:
1.18.1 Space heater shall be provid
- Page 341 and 342:
align any channel sills which form
- Page 343 and 344:
1.23.4.4 Line connections as per co
- Page 345 and 346:
iv) One (1)Ammeter with selector sw
- Page 347 and 348:
ii) One (1)Red Indicating lamp to i
- Page 349 and 350:
ii) One (1)Contactoriii) Electronic
- Page 351 and 352:
1.26.5 MOULDED CASE CIRCUIT BREAKER
- Page 353 and 354:
1.26.9 Relaya) One minute power 2 k
- Page 355 and 356:
mm215. DCDB Protection 1-2C X 6 mm2
- Page 357 and 358:
multicore cables. For multicore arm
- Page 359 and 360:
e) Physical tests for outer sheathi
- Page 361 and 362:
5.6.1. 1.1 kV grade PVC insulated c
- Page 363 and 364:
DWSM fibres shall conform to the re
- Page 365 and 366:
unit and shall also be non-hygrosco
- Page 367 and 368:
oven for 24 hours at 70 ºC. Temper
- Page 369 and 370:
finished cable each of 600mm in len
- Page 371 and 372:
QUALITY ASSURANCE PROGRAMMESECTION-
- Page 373 and 374:
SECTION:XBATTERY & BATTERY CHARGER1
- Page 375 and 376:
The cell covers shall be made of su
- Page 377 and 378:
(d) After 10 hours of discharge: 1.
- Page 379 and 380:
circuit in DC System shall not dama
- Page 381 and 382:
1.3.14. FusesAll fuses shall be HRC
- Page 383 and 384:
1.3.19. PaintingAll sheet steel wor
- Page 385 and 386:
• Prevents interference pulse bre
- Page 387 and 388:
Mains voltage3*230/400 VeffMains Fr
- Page 389 and 390:
1.2.4 Portable FixturesThree number
- Page 391 and 392:
The Contractor shall supply and ins
- Page 393 and 394:
similar to ALPHA DELUX of M/s DELTA
- Page 395 and 396:
Voltage Ratio : 415/415 VoltsNo. of
- Page 397 and 398:
ange specified. End connections and
- Page 399 and 400:
(d)(e)The maximum number of luminar
- Page 401 and 402:
10.2.1 Panels shall be sheet steel
- Page 403 and 404:
The Contactor shall be suitable for
- Page 405 and 406:
13.2 The contractor shall supply an
- Page 407 and 408:
15.10 Finished painted appearance o
- Page 409 and 410:
16.3.4 For lighting fixtures, conne
- Page 411 and 412:
(8) Making arrangement for construc
- Page 413 and 414:
Performing Standard Penetration Tes
- Page 415 and 416:
2.3.8 LABORATORY TEST1. The laborat
- Page 417 and 418:
the same under the structure, road,
- Page 419 and 420:
3.5 REQUIREMENT FOR FILL MATERIAL U
- Page 421 and 422:
4.2.7 Over the prepared sub grade,
- Page 423 and 424:
(e) A 100 mm dia medium duty MS pip
- Page 425 and 426:
foundation required to complete the
- Page 427 and 428:
including channels, sumps, tanks, t
- Page 429 and 430:
11.2 DESIGN REQUIREMENTS FOR STRUCT
- Page 431 and 432:
the designs & drawings and resubmit
- Page 433 and 434:
The method of grouting the column b
- Page 435 and 436:
All external surfaces shall have wa
- Page 437 and 438:
equired slope and treating similarl
- Page 439 and 440:
(7) All roofs shall be provided wit
- Page 441 and 442:
15.0 WATER SUPPLY(1) Water and elec
- Page 443 and 444:
SECTION -XIII-SUBSTATION AUTOMATION
- Page 445 and 446:
The SAS shall be equipped with the
- Page 447 and 448:
StatusCB- Double status All feeders
- Page 449 and 450:
The GPS time synchronizing signal (
- Page 451 and 452:
LBB, auto reclose, under frequency,
- Page 453 and 454:
Raise and lower operation of OLTC t
- Page 455 and 456:
On the HMI the object has to be sel
- Page 457 and 458:
3.2.4.6 Event List• The event lis
- Page 459 and 460:
The operator shall give commands to
- Page 461 and 462:
It shall be possible to illustrate
- Page 463 and 464:
as Interbay Level, Bay to station H
- Page 465 and 466:
support IS09660, Rockridge and Joli
- Page 467 and 468:
5.1.1 Station Level Software5.1.1.2
- Page 469 and 470:
iv.Time resolutionc. Insulation Tes
- Page 471 and 472:
diagnostics shall be used to verify
- Page 473 and 474:
The following documents shall be su
- Page 475 and 476:
d) System Maintenance: Theory of op
- Page 477 and 478:
During Guaranteed Availability Peri
- Page 479 and 480:
After the satisfactory conclusion o
- Page 481 and 482:
Basic Monitoring requirements are:A
- Page 483 and 484:
WTI (for transformer)Tap position (
- Page 485 and 486:
xliii) 220V DC-I/II source failxliv
- Page 487 and 488:
ANNEXURE-II27 OperationThe air cond
- Page 489 and 490:
Annexure-IIIInteroperability Docume
- Page 491 and 492:
• 120: File ready F_FR_NA_1.• 1
- Page 493 and 494:
1.9 Relay panels of modern modular
- Page 495 and 496:
type terminals, washers, nuts and l
- Page 497 and 498:
6.2. All front mounted equipment sh
- Page 499 and 500:
8.4. Looping of earth connections w
- Page 501 and 502:
9.8. No control relay which shall t
- Page 503 and 504:
The general concept is to have dist
- Page 505 and 506:
(n)(o)(p)(q)current of 70 times rat
- Page 507 and 508:
13.0 Transformer Protection13.1. Fo
- Page 509 and 510:
variable setting range of 20-80% of
- Page 511 and 512:
equipment shall form an integral pa
- Page 513 and 514:
Main-2 inter trip receivedMain- 2/
- Page 515 and 516:
18.6 Equipment shall meet the requi
- Page 517 and 518:
3 LBB, autoreclose, underfrequency,
- Page 519 and 520:
(d) Over current relay shall• hav
- Page 521 and 522:
1.1 SCOPE OF SUPPLYSECTION : 14DIES
- Page 523 and 524:
1.4.3. The Diesel Engines shall be
- Page 525 and 526:
h) One (1) AC Voltmeteri) Three (3)
- Page 527 and 528:
DELHI TRANSCO LIMITED(A Government
- Page 529 and 530:
Volume -IIIContentsSection - ISecti
- Page 531 and 532:
of two hundred twenty-five (225) da
- Page 533 and 534:
Schedule 5A Break-up of Type Test c
- Page 535 and 536:
4.5 We confirm that no Sales Tax in
- Page 537 and 538:
(i)(ii)(iii)Appendix 2 to the Form
- Page 539 and 540:
VOLUME-IIISECTION-IIATTACHMENTS____
- Page 541 and 542:
Attachment-IBid Security FormPlease
- Page 543 and 544:
[Attachment-3]33 KV GIS SUBSTATION
- Page 545 and 546:
Sl.No. Particulars For IndividualFi
- Page 547 and 548:
each of the partners in support of
- Page 549 and 550:
In case bidder is a holding company
- Page 551 and 552:
6.0 Financial Capabilities6.1 Bidde
- Page 553 and 554:
FinancialInformation inIndian Rupee
- Page 555 and 556:
9.0 QR Stipulations in regard to
- Page 557 and 558:
ATTACHMENT-4APAGE 1 OF 1Bidder’s
- Page 559 and 560:
Bidder’s Name and Address:To :Del
- Page 561 and 562:
Note: Bidder may note that bids con
- Page 563 and 564:
6. Establishment of Site office7. E
- Page 565 and 566:
VOLUME-IIISECTION-IVPRICE SCHEDULES
- Page 567 and 568:
Page 1 of 50SPECIFICATION NO.DTL/DG
- Page 569 and 570:
Page 3 of 50SPECIFICATION NO.DTL/DG
- Page 571 and 572:
Page 5 of 50SPECIFICATION NO.DTL/DG
- Page 573 and 574:
Page 7 of 50SPECIFICATION NO.DTL/DG
- Page 575 and 576:
Page 9 of 50SPECIFICATION NO.DTL/DG
- Page 577 and 578:
Page 1 of 2SPECIFICATION NO: DTL/DG
- Page 579 and 580:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 581 and 582:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 583 and 584:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 585 and 586:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 587 and 588:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 589 and 590:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 591 and 592:
SPECIFICATION NO: DTL/DGM(T)SSC-II/
- Page 593 and 594:
SPECIFICATION NO.Bidder's Name and
- Page 595 and 596:
SPECIFICATION NO.DTL/DGM(T)SSC-II/G
- Page 597 and 598:
SPECIFICATION NO. DTL/DGM(T)SSC-II/
- Page 599 and 600:
D. Service Tax : ………………
- Page 601 and 602:
Page 12 of 24Designation __________
- Page 603 and 604:
Page 14 of 24SPECIFICATION NO.DTL/D
- Page 605 and 606:
Page 16 of 24SPECIFICATION NO.DTL/D
- Page 607 and 608:
Page 18 of 24SPECIFICATION NO.DTL/D
- Page 609 and 610:
Page 20 of 24SPECIFICATION NO.DTL/D
- Page 611 and 612:
Page 22 of 24SPECIFICATION NO.DTL/D
- Page 613 and 614:
Page 24 of 24SPECIFICATION NO.DTL/D
- Page 615 and 616:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 617 and 618:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 619 and 620:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 621 and 622:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 623 and 624:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 625 and 626:
Page 2 of 2SPECIFICATION NO. DTL/DG
- Page 627:
Page 2 of 2SPECIFICATION NO. DTL/DG