15.0 WATER SUPPLY(1) Water and electricity shall be arranged by the contractor at his own cost.(2) The contractor shall carry out all the plumbing/erection works required for supplyof water in control room building.(3) The contractor shall carry out all the plumbing/erection works required for supplyof water to all switch yard buildings.(4) The details of tanks, pipes, fittings, fixtures etc for water supply shall be approvedby engineer in charge.(5) A scheme shall be prepared by the contractor indicating the layout and details ofwater supply which shall be got approved by the Purchaser before actual start ofwork including all other incidental items not shown or specified but as may berequired for complete performance of the works.(6) Bore wells and pumps for water supply are in the scope of contractor.16.0 SEWERAGE SYSTEM(1) Sewerage system shall be provided for control room building cum administrativebuilding.(2) The Contractor shall construct septic tank and soak pit suitable for 50 users for substation if the municipal sewer in the vicinity does not exists. In case municipalsewer line is available in the area, the connection of sewerage system of switchyard building with municipal sewer shall be in the scope of bidder.(3) The system shall be designed as per relevant IS Codes.17.0 STATUTORY RULES(1) Contractor shall comply with all the applicable statutory rules pertaining tofactories act (as applicable for the State). Fire Safety Rules of Tariff AdvisoryCommittee. Water Act for pollution control etc.(2) Provisions for fire proof doors, number of staircases, fire separation wall,plastering on structural members (in fire prone areas) etc. shall be made accordingto the recommendations of Tariff Advisory Committee.(3) Statutory clearance and norms of State Pollution Control Board shall be followedas per Water Act for effluent quality from plant.(4) Requirement of sulphate resistant cement (SRC) for sub structural works shall bedecided in accordance with the Indian Standards based on the findings of thedetailed soil investigation to be carried out by the Bidder._____________________________________________________________________T.No. DTL/DGM(T)SSC-II/GPL/09-10/GIS/GT-02Page 441 of 566

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!