12.07.2015 Views

BOILERMATE BOILERMATE - Gledhill Spare Parts

BOILERMATE BOILERMATE - Gledhill Spare Parts

BOILERMATE BOILERMATE - Gledhill Spare Parts

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8BAR 1 - HTBAR 2 - STBAR 3 - HWLED DISPLAY2.0 INSTALLATION2.3 COMMISSIONINGOnce the system is finally filled turn downthe servicing valve for the ballvalve inthe F & E cistern to the point where thewarning/overflow will cope with the dischargearising from a ballvalve failure.Cleansing Hot/Cold Water System TreatmentFully flush and if necessary chlorinate the hotand cold water system in accordance with therecommendations in the Model Water Byelawsand BS 6700.Commissioning the BoilerMate ControlSystemSW1SW2JumperSettingsFor maximum system efficiency the storethermostat must be in control of the boiler i.e.the boiler cycles on the store thermostat andnot on its integral thermostat.The BoilerMate control system will automaticallycommission itself to match the actualperformance of the installed boiler.The control system/A.C.B has been initialised atthe factory and will operate automatically.However, the operation of the control systemshould be checked as follows on the A.C.B(shown opposite).GreenLED'SFuse43211. Set the boiler thermostat to MAXIMUM2. Switch off heating on the clock/programmer and room thermostat3. Switch off hot water on the programmerif 2 channel clock is fitted4. Check the jumper settings arecorrect. These must all be in thecorrect positions for the appliance towork correctly i.e. fitted on terminals1, 3 and 4.5. Switch on the mains supply.The A.C.B. will automatically commissionitself to suit the system/boiler and the dotafter the ON the display will flashe.g.APPLIANCE CONTROL BOARD (A.C.B)4 = Not used on this appliance3 = Heating pump on2 = Boiler pump on1 = Boiler onThe control system is now initialised. Theoperation of the controls can now be checked.1. Horizontal LED bar 2 ‘store’ will be lit.Boiler and boiler pump will be running andgreen LED’s 1 and 2 on the A.C.B will beswitched on.Page 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!