12.07.2015 Views

BOILERMATE BOILERMATE - Gledhill Spare Parts

BOILERMATE BOILERMATE - Gledhill Spare Parts

BOILERMATE BOILERMATE - Gledhill Spare Parts

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.0 SERVICING Press SW1 to move acrossthe diagram.Press SW2 to move down thediagram.In addition to the main LED display the ACB hasfour green LED’S which can be used to checka supply is being provided when required tothe Boiler (LED 1), Boiler pump (LED 2) andHeating pump (LED 3). LED 4 is not used onthis appliance.The following procedure should be followedto carry out these checks.• Switch off mains• Check and if necessary insert correctjumpers 1, 3 & 4) to suit appliance type• Insert jumper 5• Switch on mains• The PCB will carry out functional checks andthen stop• Switch off mains• Remove jumper 5• Switch on mains to put into normaloperating modeDuring the functional checks the green LED’s1-4 will be switched on and then off at 5second intervals.Note: If the A.C.B. board is replaced it willre-initialize itself automatically.The operation of the system controls/operation can then be checked.The same appliance control board is usedon a number of appliances and the jumpersMUST be in the correct position for theappliance to work satisfactorily.See section 2.3 Commissioning for details.Page 35If the problem cannot be resolved and theappliance is fitted with the switch emergencyelectric backup this should be switched on andoperated in accordance with the instructionson the label fitted to the appliance until theinstaller/manufacturer can attend.When requesting a visit from themanufacturer the installer must have thecompleted ‘Benchmark’ commissioning/service record sheet to hand to enable helpto be provided.<strong>BOILERMATE</strong> 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!