12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5- Supply and laying LDEP film 150micron thi<strong>ck</strong>ness in bed includingcost of all material labor T&P etc.work as per direction of Engineer incharge.m2 3979.006- Providing 100mm thi<strong>ck</strong> cementconcrete A-20 M-15 (1:2:4) lining inbed and side slope by paver machineand chemical curing in side slopeincluding dewatering cost of allmaterial labor T&P with centeringshuttering and making grooves injoints for proper completion of workas per direction of Engineer incharge.7- 25mm thi<strong>ck</strong> cement plaster in 1:20CM on top of filter including cost ofall material labor T&P etc. requiredfor proper completion of work as perdirection of Engineer in charge.m2 7724.00m2 3745.008- Providing and laying C.C. A-20 M-15 (1:2:4) in coping including costof all material labor T&P requiredfor proper completion of work as perdirection of Engineer in charge.m3 73.009- Providing 100mm thi<strong>ck</strong> porousconcrete window (400x400x100) inbed and side slope (300x300x100) in1:4 cement and stone grit of size10mm to 20mm including cost of allmaterial labor T&P required forproper completion of work as perdirection of Engineer in charge.m3 3.60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!