12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cutting shall be done from to bottom. Under no circumstances shall under-mining orunder cutting be allowed. The side of excavation shall be dressed or trimmed, andbottom shall be leveled or graded and rammed as directed by engineer-in-charge.All cutting shall done to the required levels. In case it is taken deeper by thecontractor, it shall be brought to the required levels by filling in with earth dulyconsolidated at the contractors cost. However, in case of hard ro<strong>ck</strong>, where blastingoperations have been resorted to, cutting shall be measured to the actual levels,provided the Engineer-in-charge is satisfied that the contractor has not gone deeperthan what was unavoidable.4.03 Filling: The earth from cutting shall be directly used for filling and no claim for doublehandling of earth shall be entertained. Filling shall be done in regular horizontal layereach not exceeding 20 cm. In depth, The earth shall be free from all roots, grass andrubbish and all lumps and clods exceeding 8 cm in any direction shall be broken.Each layer shall be consolidated by breaking colds and ramming. Watering shall bedone if so stipulated. The top surface of the finally finished area shall be neatlydressed.4.04 The measurements should be taken of the filling area by cross section and deductionof 2% should be made for the settlement, since the compaction of the filled earth is tobe done by the mechanical compaction to the required specification. Moreover,measurement of the borrow area should also be done and compared to the quantityarrived by the sectional measurement of the filling area. The payment shall be madefor the lesser quantity out of the above to said of measurements. The average leadshould be measured from the center of gravity of the borrow area to center of gravityof fill area.5. EARTH :5.01 Earth for the banks and roads shall be thoroughly broken upto before it is put intobaskets.5.02 The banks and berms of the channel shall be made in conformity with drawings. No.grass jungle or bush, roots, clods and jungle shall be placed in the embankment.5.03 In extending any embankment the benching shall be done by cutting steps not steeperthan 2 to 1 on the old embankment before laying fresh earth in the extension. Noextra payment will be made for this work.5.04 The height of the banks and berms shall be kept 10%, higher than the designedsection so as to allow for subsequent settlement in case of manual compaction 2%higher than designed section if the compaction is done by heavy mechanicalequipment upto 90% or above of M.D.D.5.05 The travel of all labour shall be well planned and utilized to the maximum possibleadvantage for compaction and for this purpose the earth in each layer shall be laidbeginning from the father end.6. ISPECTIO ROAD :

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!