12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical Specification for PUCCA WORKS1. General1.01 – All the items of work under this contract shall be carried out in acceptance withthe detailed Irrigation Deptt. specifications. In case specifications of any work are not given,State Engineers Academy, Kalagarh in March 1990 and also relevant I.S. codes/manuals shallcarry the same out in accordance with Uttar Pradesh Irrigation Department. (copy of detailedIrrigation Department Specification are available in the office of Executive Engineer & also inthe office of Engineer Incharge which can be seen in the office on request & if requiredcontractor may take notes from them & as directed by Engineer Incharge except in so for as theyare amended or supplemented by the following).1.02 – In case of any discrepancy between the aforesaid two the latter shall prevail.1.03 – Contractor shall install hand-pump to ensure adequate supply of water for theconstruction and drinking water for labour at his own cost. He shall maintain the hand pump ingood condition throughout the period of execution of work.1.04 – The contractor shall also prepare & maintain a pucca water tank of size 3 m x 3 mx 1 m at his own cost to store clean water for construction. The water tank shall be constructed asper direction & specification given by the Engineer Incharge.2. SITE CLEARIG :2.01 Within the area described and shown on the plan, rubbish of all kinds, includingsuperfluous earth, shall be cleared away. All weeds, brushwood, stumps, roots oftrees and sapling of firth upto 30 cm measured at a height of 1 m ground shall begrubbled up and removed and the serviceable material sta<strong>ck</strong>ed neatly, so as not tointerfere with construction for disposal as ordered by the Engineer. The roots of treesshall be removed to a minimum depth of 60 cm below ground level or a minimum of30 cm below formation level whichever is lower. All holed made during clearingshall be filled with earth, well rammed and nearly leveled off.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!