12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

compacted further suitable deductions in rates will be made for which the decision ofengineer-in-charge will be final and binding on the contractor.11.04 he following work shall not be measured separately and shall be deemed to have beenincluded in the tender rates.1. Setting out work profiles etc.2. Site clearance3. Forming steps inside of excavation and their removal after measurements.4. Forming falls inside of excavation and their removal after measurements.5. Removing steps or falls in excavation.6. Providing supports for pipes, electric etc. during the excavation.7. Dressing or trimming of excavation, leveling or gradeing.8. Cost of all tools and plant, housing and sanitary arrangements as required underlabour laws.9. All issues and royalty levies and taxes levied by the central or state governmentand by local bodies.10. Cost of borrow area.11. Liabilities under workman compensation act.12. Cost of maintenance of works and their protections against damage by rains,winds etc.13. Clearing of herbs, shrubs, bushes, small trees not exceeding 30 cm in girth.Signature of ContractorSuperintending Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!