12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of the work or the performance of the contract and shall not be entitled to recoveror be paid or be given credit for any sum for any work therefore actuallyperformed b y him under this contract, unless and until the Executive Engineer orthe Sub-Divisional Officer acting under this order shall have certified in writingthe performance of such work and the value thereof the contractor shall only beentitled to be paid the value as so certified.(iii) If upon any occasion the …………………. Engineer abstains fromexercising the powers given to him by this clause such abstention shall notprevent him from exercising such powers upon a subsequent occasion if thecontractor again makes default nor shall such abstention absolve the contractorfrom liability to any compensation for any default which he may have made.CLAUSE 4 – If the ………………… Engineer exercises any of the powersgiven to him by caluse 3 he may, if he so desires, take possession of all or anytools, plants, materials and stores in or the work, or at the site thereof andbelonging to be contractor or procured by him and intended to be used for theexecution of the work or any part thereof, and may pay or allow the contractor forthe same at the contract rates, or in the case of these not being applicable, atcurrent market rates to be certified by the ………………… Engineer whosecertificate thereof shall be final and if the ………………. Engineer does notdesire to do so, the …………...…. Engineer may by notice in writing to thecontractor or his clerk, to the work foreman or other authorized agent require himto remove such tools, plants, materials or stores from the premises (within a timeto be specified in such notice), and if the contractor fails to comply with any suchrequisition the …………….. Engineer may remove them at the contractor’sexpense and at his risk in all respects by auction or private sale and the certificateof the ………………. Engineer as to expenses of any such removal and theamount of the proceeds and expenses of any such sale shall be final andconclusive against contractor.CLAUSE 5 – If the contractor desires an extension of the time forcompletion of the work on the grounds of any unavoidable hindrance to itsexecution having arisen he shall apply in writing to the ……………… Engineerwho if in his opinion reasonable grounds are shown therefore, shall extend histime limit upto a period of six months or 50% of the time limit provided as timeof completion whichever is less and thereafter ………………… Engineer shall ifin his opinion (which shall be final) ………………………… reasonable groundare shown there for authorize extension as may, in his opinion, be necessary orproper.CLAUSE 6 – On completion of the work the contractor shall send aregistered notice to the Sub-Divisional Officer (hereinafter called EngineerIncharge) giving the date of completion and shall also send a copy of such noticeto the Executive Engineer and shall request the Engineer Incharge to give him acertificate of completion. No such certificate will be given nor shall the work beconsidered to be complete until the contractor has removed from the premises onwhich the work has been executed all scaffolding, surplus materials and rubbishContractorremains liable topay compensationif action nottaken underclause 3.Powers to takepossession of orrequire removalof or sellcontractor’s plant.Extention of time

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!