12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TECHICAL SPECIFICATIOS1.0 GEERAL1.1 DESCRIPTION OF WORK(a) The work consists of …………………….…………... The chainage ofthe work has been defined at sit site by pillars built along the alignment.(b) The construction of the above work shall be done conforming toapproved drawing, supplied by the Engineer-in-Charge.1.02 All works shall be carried out in accordance with the detailed specificationshereinaftger described I.D. Specifications. In case specifications of any workare not given, State Engineers Academy, Kalagarh in March 1990 and alsorelevant I.S. codes/manuals shall carry the same out in accordance with UttarPradesh Irrigation Department. In case the specifications of any work are notgiven either in the Uttar Pradesh, Irrigation Department specifications orhereinafter, the work shall be carried out in accordance with the instructionsand directions of the Engineer-in-charge.1.03 No claim shall be entertained from the contractor for compensation ordamages resulting from non-availability of land due to resistance ofcultivator or otherwise. Only suitable time extension shall be granted to thecontractor, for the period for which delay is caused or work is help up.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!