12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

y the contractor must conform to such specification and/or test.CLAUSE 12 (B) – Provided always that the contractor shall not be entitledto any compensation for damages caused or loss sustained by him to for latesupply of materials of store by the Engineer Incharge for the reasons beyond hiscontrol.CLAUSE 13 – All articles required by the contractor for the construction ofthe work and which the contractor is to supply himself, shall be obtained by thecontractor from the firms with which the Director of Industries has madearrangements and if for the supply of any articles no such arrangements havebeen made, any such articles supplied by the contractor shall conform to suchspecification and/or tests, if any, as may be prescribed by the Director ofIndustries in consultation with the consuming department.CLAUSE 14 – The contractor shall obtain from the stores of the EngineerIncharge, all such imported stores or materials as may be required in anyconsiderable quantity for the work or any part thereof or for making up articlesrequired therefore or in connection there with. The value of such stores and asmay be supplied to the contractor by the Engineer Incharge will be debited to thecontractor in his account at the rates shown in the schedule to the contract and ifthey are not entered in Schedule, they will be debited at the cost price which forthe purposes of this contract shall include the cost of carriage and all otherexpenses whatsoever which shall have been incurred in obtaining delivery of thesame at the stored aforesaid, the Executive Engineer may issue materials to acontractor from existing sto<strong>ck</strong> if he asked for any excess of those entered inSchedule in such cases the price charged will be sto<strong>ck</strong> rate or market ratewhichever is greater.CLAUSE 15 – The contractor shall execute the whole and every part of thework in the most substantial and workman like manner and in every respect instrict accordance with the specification both as regards materials and otherwise.The contractor shall also conform exactly, fully and faithfully to the designs,drawings and instructions in writing relating to the work signed by the EngineerIncharge and lodged in his office, and the contractor shall be entitled to inspectedthe same during office hours and may at his own expense have copies of thespecification and of all such designs, drawings and instructions as aforesaid madefor his own use.Stores importedfrom Europe to beobtained fromGovernment.Work to beExecuted inaccordance withSpecifications

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!