12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10. MEASUREMET AD PAYMET :10.01 Measurement of earthwork shall be done by observing cross section at points whereinitial cross section 25 m interval or as per direction of Engineer-in-charge were takento work out the quantities of earth work. These cross sections shall be superimposedon the initial cross section already plotted. The designing cross section shall also bemarked on these cross sections in red and the quantity of earthwork shall becalculated in both cases. In no case quantity of earth in excess of design section shallbe paid to the contractor.10.02 Where the earthwork in filling is greater than the excavation, the measurements shallbe taken for excavation and fill section both and the quantity of earth work shall becalculated by cross section measurements as above. The contractor shall be paid forquantities of fill section only. Deduction for settlement shall be made as per I.D.specification. In case of borrowed earth needed for filling, the quantity of borrowedearth shall also be measured at borrow site and this quantity shall be comparable tothe quantity used in filling section.10.03 All measurements shall be taken in the presence of the contractor or his authorizedrepresentative who shall sign the measurement book in token of acceptance ofmeasurements.11. PAYMET ;11.01 The earth work in bill of quantities for final payment shall be measured only when thework is completed as per desired section of the earth work.11.02 Running payment shall be made contractor for the earth work done uniformly andlaid in embankment at the rates calculated by the engineer-in-charge on the followingbasis.1. For the quantity executed upto 25% (Twenty fivepercent) of the total quantity of earth in each 100 mreach.2. For the quantity executed upto 50% (Fifty fivepercent) of the total quantity of earth in each 100 mreach3. For the quantity executed upto 90% (Ninety percent)of the total quantity of earth in each 100 m reach4. For the quantity executed above 90% (Ninetypercent) of the total quantity of earth in each 100 mreachUpto 65% (Sixty five percent) ofagreement rates.Upto 75% (Seventy five percent)of agreement rates.Upto 90% (Ninety percent) ofagreement rates.Upto 95% (Ninety five percent) ofagreement rates.The reach in which complete earth work has been done including the necessary dressing etc.The payment can be made at full agreement rate or to the extent to the cost of work done asestimated by the engineer-in-charge.11.03 Hens work is left incomplete in any reach the rates shall be fixed as per EngineerIncharge or as executed rate “which ever is minimum”. If the work is left undressed or un-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!