12.07.2015 Views

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

dk;kZy;ZZZ v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk v/kh{kk vfHk;Urk ck.k ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.01 The department has constructed inspection road is damaged or obstructed bydepositing earth etc. on it by the contractor, he shall promptly restore it to his owncost, failing which this work shall be done departmentally and expenditure soincurred shall be recovered from the contractor’s bill. All haul road shall beconstructed by contractor at his own.7. DRESSED SURFACE :7.01 The final internal surface of excavation, the top and outer slopes of the banks shall befinally dressed to a smooth finish. Any hollows or cuts caused by weathering or thecontractor without any extra payment shall make other reasons good.7.02 The contractor shall maintain leveling of the banks for movement of Governmentvehicles or machines as and when required in connection with the work and he wouldnot be entitled to any claim on the account.8. ISPECTIO AD TESTS :8.01 All compaction operation shall be subject to control by laboratory test/Routine fieldtest shall be conducted and regular inspection of the work shall be made by thefield/laboratory staff to determine whether the desired compaction is being achieved.In case the tests show that proper density has not been obtained, extra rolling may berestored to as and when necessary. Next layer shall be laid only when the lower layerhas been properly compacted.8.02 The contractor shall permit taking of samples for performance of tests, wherenecessary, and shall not be entitled to any claim for compensation due to any delaythat may be caused on this account.9. MAITEACE OF EARTH WORK DURIG PROGRESS OF WORK :9.01 The work shall be taken over by the department only when the earthwork has beencompleted in the complete reach of the agreement in accordance with the drawing,across section as per specified levels to the full satisfaction of the engineer-in-charge.9.02 During the execution of work the contractor shall be responsible for its maintenance.Any damage to the work already executed on account of rains, cross drainage, or flowfrom adjoining reaches shall be repaired by him. All rain washing and the rain cutsshall also be repaired by him. No extra payment shall be made to the contractor forthese operations.9.03 The contractor shall make kiaries on the top of the embankment to hold the rainwater.The daula around kiaries shall be strong enough to holds the rainwater. Watch shallalso be kept to avoid breaching of these daulas. He shall also make arrangement todivert all also be made to cross all the drainage from one bank to the other. All thesework shall be carried out by the contractor at his own cost and no extra payment shallbe made.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!