- Page 1 and 2: TIME CONDOR CorporationSELF-PROPELL
- Page 3 and 4: iINTRODUCTIONThe primary purpose of
- Page 5 and 6: iiiTABLE OF CONTENTSIN'TRODUCTION
- Page 7 and 8: ... D. PLATFORM AND UPPERCONTROL ST
- Page 9 and 10: ..LOWERCONTROLSREDEMERGENCY _____ t
- Page 11 and 12: • D.TRANSPORTINGThis CONDOR® can
- Page 13 and 14: APPENDIX: DECALS ILLUSTRATION~,..0r
- Page 15 and 16: APPENDIX: DECALS ILLUSTRATION1OPERA
- Page 17 and 18: APPENDIX: DECALS ILLUSTRATION6UP$DO
- Page 19 and 20: --.APPENDIX: DECALS ILLUSTRATION201
- Page 21: TIME CONDOR CorporationSELF-PROPELL
- Page 24 and 25: iiTIME CONDOR CorporationCONDOR® S
- Page 26 and 27: Effectiye January 1, 1993WARRANTy P
- Page 28 and 29: D. PROCESSING OF WARRANTY CLAIMDuri
- Page 30 and 31: CONDOR® Model V2648/53XL. V2648/53
- Page 32 and 33: .,SPECIFICATIONSSPECIFICATIONSV2648
- Page 34 and 35: Serial Number Location •21The CON
- Page 36 and 37: HYDRAULIC SYSTEM DESCRIPTION•The
- Page 38 and 39: -----------------------------------
- Page 40 and 41: PRESSURE ADJUSTMENT PROCEDURES•NO
- Page 42 and 43: L6613Nflf7:OQ-LS£Z6 'IVilNVW!-"!",
- Page 44 and 45: ELECTRICAL SYSTEM DESCRIPTIONThe fo
- Page 46 and 47: UPPER CONTROL FUNCTIONS (cont'd)•
- Page 48 and 49: MACHINE OPTIONS DESCRIPTIONThe foll
- Page 52 and 53: BATTERY SERVICEBATTERY SERVICING TO
- Page 54 and 55: --The average state of charge of th
- Page 56 and 57: DETERMINING CAUSES OF BATTERY FAILU
- Page 58 and 59: FIGURE: YSA TTERY TESTING CHARTSTEP
- Page 60 and 61: PREVENTIVE MAINTENANCEIn conjunctio
- Page 62 and 63: PREVENTIVE MAINTENANCE INSPECTIONTh
- Page 64 and 65: PREVENTIVENUUNTENANCEDAILY INSPECTI
- Page 66 and 67: B. ARMSTACKVisual Inspection:Lift C
- Page 68 and 69: PREVENTIVE MAINTENANCE50 HOUR INSPE
- Page 70 and 71: HYDRAULIC FLUID SPECIFICATIONSFORCO
- Page 72 and 73: TROUBLESHOOTING GUIDE115 VAC BATTER
- Page 74 and 75: CAUTIONDO NOT charge batteries with
- Page 76 and 77: Connect the black lead of the power
- Page 78 and 79: SECTION 3 -AMMETER READS 30 AMPS FO
- Page 80 and 81: •If the charger remains on longer
- Page 82 and 83: APPENDIX ATIME CONDOR CorporationNO
- Page 84 and 85: MANUAL 92357-002JUNE 1997•
- Page 86 and 87: IMPORTANTYou are required by ANSIIS
- Page 88 and 89: RESPONsmILITIES MANUALReprint from
- Page 90 and 91: RESPONSIBILITIES MANUALtrainee.The
- Page 92 and 93: RESPONSIBILITIES MANUALReprint from
- Page 94 and 95: RESPONSIBILITIES MANUALReprint from
- Page 96 and 97: RESPONSIBILITIES MANUALReprint from
- Page 98 and 99: RESPONSIBILITIES MANUAL(7) Electroc
- Page 100 and 101:
Figure 1 - Typical Examples of Equi
- Page 102 and 103:
INTRODUCTIONiThe primary purpose of
- Page 104 and 105:
CONDOR® MODEL V2648/S3 & V2648/S3X
- Page 106 and 107:
FIGURE B-Recommended Spare Parts Li
- Page 108 and 109:
TIME CONDOR CORPORATION PARTS DEPAR
- Page 110 and 111:
FIGURE 1: Final InStallation.ITEM P
- Page 112 and 113:
FIGURE 2: Decal Installation.ITEM P
- Page 114 and 115:
FIGURE3: Chassis Assembly -V26481XL
- Page 116:
~-------"'-~.......CALAVAR SERVICE.
- Page 119 and 120:
• FIGURE 4: Hose KitP2PlHYDRAULIC
- Page 121 and 122:
.FIGURE 5: Steer CylinderITEM PART
- Page 123 and 124:
• FIGURE 7: Hub Motor Assembly110
- Page 125 and 126:
• FIGURE 9: Belley Pan Assembly2
- Page 127 and 128:
• FIGURE 10: Motor & Pump Assembl
- Page 129 and 130:
--. - ~ 2 2PL27/8 ~ m(2.875 REF) [V
- Page 131 and 132:
A14FIGURE 11: Pump ASSembly.SECTION
- Page 133 and 134:
FIGURE 12: Motor 24VDC ASSembly.ITE
- Page 135 and 136:
FIGURE 13: Valve Insta1lation •CR
- Page 137 and 138:
FIGURE 13: Valve Assembly •ITEM P
- Page 139 and 140:
FIGURE 14: Charger 115V/60HZ-25N24V
- Page 141 and 142:
FIGURE 14: Charger 115V/25AMOd .•
- Page 143 and 144:
FIGURE 15: Wiring Installation - V2
- Page 145 and 146:
FIGURE 16: Box Assembly - Lower Con
- Page 147 and 148:
FIGURE 16: Box Assembly - Lower Con
- Page 149 and 150:
FIGURE 16: Box Assembly - Lower Con
- Page 151 and 152:
FIGURE 16: Box Assembly - Lower Con
- Page 153 and 154:
FIGURE 17: Armstack ASSemblY.~IT~E~
- Page 155 and 156:
FIGURE 17: Armstack ASSembly.~IT~E=
- Page 157 and 158:
FIGURE 17: AnnstackAssemblyG~IT~E=M
- Page 159 and 160:
FIGURE 18: Platform InstallationGIT
- Page 161 and 162:
FIGURE 19: Upper Control Box ASSemb
- Page 163 and 164:
FIGURE 19: Upper Control Box ASSemb
- Page 165 and 166:
BILL OF MATERIALS INQUIRY Date: 07/
- Page 167 and 168:
• FIGURE 22: Motion Alarm (Option
- Page 169 and 170:
• FIGURE 24: Descend Alarm (Optio
- Page 171 and 172:
• FIGURE 26: Hour Meter (XL-Optio
- Page 173 and 174:
• FIGURE 28: Low-Voltage Warning
- Page 175 and 176:
TIME CONDOR CorporationSELF-PROPELL