Minutes of the 37th Meeting of the Expert Appraisal Committee ...

Minutes of the 37th Meeting of the Expert Appraisal Committee ...

Minutes of the 37th Meeting of the Expert Appraisal Committee ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

eutilized for gardening. Domestic effluent will be treated through septic tank and soak pit. ETP waste (5MTPA) will be packed in bags and stored in designated area, which will be sent to landfill site <strong>of</strong> M/sGEPIL, Silvassa for final disposal. Yarn waste (250 MTPA) will be packed in bags and stored indesignated area, which will be recycled back/sold to actual users. Used oil (12 KLPA) will be stored indrums and sold to registered refiners/sent to TSDF site. Empty drums/bags (5 lacs per annum) will bestored at a separate storage area and reused for packing/sold to authorized scrap vendor.Public hearing was exempted by categorizing <strong>the</strong> project as category B2 as <strong>the</strong> polyester chipswill be purchased and <strong>the</strong>re is no acquisition <strong>of</strong> additional land for <strong>the</strong> expansion and <strong>the</strong>re will be zerodischarge <strong>of</strong> effluent.After detailed deliberations, <strong>the</strong> <strong>Committee</strong> has recommended <strong>the</strong> proposal for environmentalclearance subject to stipulation <strong>of</strong> following specific conditions along with o<strong>the</strong>r environmentalconditions:i. It is noted that <strong>the</strong> project does not fall within 100 m distance from <strong>the</strong> boundary <strong>of</strong> Dadra andNagar Haveli Wildlife Sanctuary. The company shall obtain necessary clearance under <strong>the</strong>Wildlife (Protection) Act, 1972 from <strong>the</strong> National Board for Wild life as may be applicable in thiscase.ii.iii.iv.The company shall install wet scrubber and bag filters etc. to control <strong>the</strong> particulate emissionsbelow 50 mg/Nm 3 .The National Ambient Air Quality Standards issued by <strong>the</strong> Ministry vide G.S.R. No. 826(E) dated16 th November, 2009 should be followed.Gaseous emission levels including secondary fugitive emissions from all <strong>the</strong> sources shall becontrolled within <strong>the</strong> latest permissible limits issued by <strong>the</strong> Ministry vide G.S.R. 414(E) dated 30 thMay, 2008 and regularly monitored. Guidelines / Code <strong>of</strong> Practice issued by <strong>the</strong> CPCB should befollowed.v. The total water requirement shall not exceed 470 KLD and Permission shall be obtained to draw<strong>the</strong> water from <strong>the</strong> ground water from <strong>the</strong> State Ground Water Board /Central Ground WaterAuthority as may be applicable to this case.vi.vii.viii.ix.Efforts shall be made to make use <strong>of</strong> rain water harvested. If needed, capacity <strong>of</strong> <strong>the</strong> reservoirshould be enhanced to meet <strong>the</strong> maximum water requirement. Only balance water requirementshall be met from o<strong>the</strong>r sources.Risk & Disaster Management Plan along with <strong>the</strong> mitigation measures shall be prepared and acopy submitted to <strong>the</strong> Ministry’s Regional Office at Bhopal, SPCB and CPCB within 3 months <strong>of</strong>issue <strong>of</strong> environment clearance letter.As proposed, green belt shall be developed in 33 % <strong>of</strong> <strong>the</strong> plant area. Selection <strong>of</strong> plant speciesshall be as per <strong>the</strong> CPCB guidelines in consultation with <strong>the</strong> DFO.At least 5 % <strong>of</strong> <strong>the</strong> total cost <strong>of</strong> <strong>the</strong> project shall be earmarked towards <strong>the</strong> Enterprise SocialCommitment based on locals need and item-wise details along with time bound action planshould be prepared and submitted to <strong>the</strong> Ministry’s Regional Office at Bhopal. Implementation <strong>of</strong>such program should be ensured accordingly in a time bound manner.37.3.4 Proposed Coke Oven Plant (1,20,000 TPA), Sinter Plant (1,20,000 TPA), and Captive PowerPlant (1.5 MW) at Village Hirodih, P.S. Jainagar, District Koderma, Jharkhand by M/s JupitarCoke & Energy Private Limited - regarding Environmental ClearanceThe project authorities and <strong>the</strong>ir consultant, M/s Visiontek Consultants, Bhubaneswar gave adetailed presentation on <strong>the</strong> salient features <strong>of</strong> <strong>the</strong> project and proposed environmental protectionmeasures to be undertaken as per Terms <strong>of</strong> References (TORs) awarded during <strong>the</strong> 12 th meeting <strong>of</strong> <strong>the</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!