12.07.2015 Views

“Computational Civil Engineering - "Intersections" International Journal

“Computational Civil Engineering - "Intersections" International Journal

“Computational Civil Engineering - "Intersections" International Journal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“Computational <strong>Civil</strong> <strong>Engineering</strong> 2005”, <strong>International</strong> Symposium 2853. EXEMPLEThere is considered the network from fig.1. The network is supplied in the node 1by a pumping station but in node 11 is supplied by tank 12. The waterconsumptions in network on an extended period of 24 hours are given in table 1.Figure 1. Example networkTable 1. Water consumption at nodes and supplying in nodes 1 and 12 (in L/s)NODE/H 1 2 3 4 5 6 7 81 -80.34-80.34-80.34-80.34-80.34-80.34-80.34-72.542 2.37 1.20 1.50 1.56 1.80 2.10 2.88 3.753 3.95 2.00 2.50 2.60 3.00 3.50 4.80 6.254 2.37 1.20 1.50 1.56 1.80 2.10 2.88 3.755 14.22 7.20 9.00 9.36 10.80 12.60 17.28 22.506 4.74 2.40 3.00 3.12 3.60 4.20 5.76 7.507 4.74 2.40 3.00 3.12 3.60 4.20 5.76 7.508 3.16 1.60 2.00 2.08 2.40 2.80 3.84 5.009 10.27 5.20 6.50 6.76 7.80 9.10 12.48 16.2510 3.95 2.00 2.50 2.60 3.00 3.50 4.80 6.2511 11.85 6.00 7.50 7.80 9.00 10.50 14.40 18.7512 18.72 49.14 41.34 39.78 33.54 25.74 5.46 -24.96NODE/H 9 10 11 12 13 14 15 161 -73.58-65.78-57.98-64.74-72.54-80.34-80.34-80.342 3.69 3.60 3.24 3.45 3.00 3.45 3.30 3.303 6.15 6.00 5.40 5.75 5.00 5.75 5.50 5.504 3.69 3.60 3.24 3.45 3.00 3.45 3.30 3.305 22.14 21.60 19.44 20.70 18.00 20.70 19.80 19.806 7.38 7.20 6.48 6.90 6.00 6.90 6.60 6.607 7.38 7.20 6.48 6.90 6.00 6.90 6.60 6.60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!