12.07.2015 Views

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.1 The research methodologyFollow<strong>in</strong>g on from the questionnaire survey, thissection further explores the need to l<strong>in</strong>k between firm levelprocesses through the analysis of 4 case studies. Thesecase studies have been produced on award w<strong>in</strong>n<strong>in</strong>gprojects at the North West Regional <strong>Construction</strong> Awards2009. Interviews have been conducted with the keyactors to track the collaborative ways <strong>in</strong> which thesuccessful <strong>in</strong>novations have been generated and to<strong>in</strong>vestigate the consequent benefits of <strong>in</strong>novation at theproject and company level. The follow<strong>in</strong>g issues wereaddressed dur<strong>in</strong>g the <strong>in</strong>terviews:n <strong>Project</strong> <strong>in</strong>formation (type and size of theproject, parties <strong>in</strong>volved)n Ma<strong>in</strong> reasons/drivers to <strong>in</strong>novate (end user,competition, performance requirements, technology,etc.)n Major <strong>in</strong>novation <strong>in</strong>troduced with<strong>in</strong> the project (typeof <strong>in</strong>novation and stage with<strong>in</strong> the project lifecycle),outputs of <strong>in</strong>novation (<strong>in</strong> terms of new or improvedproduct/process/service)n Inputs of <strong>in</strong>novation (human, f<strong>in</strong>ancial, technical,and non-technical resources and <strong>in</strong>ternal/externalknowledge sources)n Enablers of <strong>in</strong>novation (at each level)n Barriers to <strong>in</strong>novate (at each level)n Major tool/strategy employed to realize <strong>in</strong>novation(<strong>in</strong>novation policy, measurement system, strategies atfirm and project level, solution of problems)n Roles of each stakeholder <strong>in</strong> (stimulat<strong>in</strong>g/ implement<strong>in</strong>g)the <strong>in</strong>novation (relations, communication, andcooperation among project participants)n Major benefits/impacts of this <strong>in</strong>novation(productivity, profitability, image, new markets, etc.)n Lessons learned from the <strong>in</strong>novation process(captur<strong>in</strong>g/transferr<strong>in</strong>g project knowledge)The cases highlight the breadth and depth of thecompanies’ activities to br<strong>in</strong>g <strong>in</strong>novation <strong>in</strong>to projects.The active measures to drive value from collaborativepartnerships and community/end user engagementfeature as significant enablers of <strong>in</strong>novation. The<strong>in</strong>d<strong>in</strong>gs of these case studies are also published as<strong>in</strong>dividual reports and can be found atwww.<strong>in</strong>novationcasestudies.5.2 Case study 1: Cleveley’sCoastal Defence andPromenade EnhancementSchemeTHE CONCEPTA partnership between Wyre Borough Council, BirseCoastal and other strategic partners was formed <strong>in</strong>March 2004 follow<strong>in</strong>g an extensive, quality-basedtender process compliant with European procurement.The project was designed to improve flood protectionto 8700 properties <strong>in</strong> the Cleveleys area and toupgrade Cleveleys’ promenade. The <strong>Project</strong> is WyreBorough Council’s largest ever civil eng<strong>in</strong>eer<strong>in</strong>g projectand the first partner<strong>in</strong>g contract it has let. The schemewith a contract value of £21m was funded by WyreBorough Council, DEFRA, Environment Agency, EuropeanRegional Development Fund and delivered <strong>in</strong> 30 months.The Cleveley’s scheme has been delivered <strong>in</strong> accordancewith the pr<strong>in</strong>ciples of Construct<strong>in</strong>g Excellence, engagedmultiple stakeholders mak<strong>in</strong>g a real difference to thelocal environment and the quality of life. Demonstrat<strong>in</strong>gnumerous examples of <strong>in</strong>novation and best practice, itis considered for the ‘<strong>Project</strong> of the Year’ award by CCINorth West.INNOVATION JOURNEY/STORY<strong>Innovation</strong> on the ProcurementThe <strong>in</strong>novative procurement and delivery of this projectwas based on the key tenets of the Latham and EganReports. In particular much emphasis was placed onthe adoption of the partner<strong>in</strong>g approach to achievebetter work<strong>in</strong>g relationships and deliver more efficientconstruction <strong>in</strong> terms of quality, customer satisfaction,timel<strong>in</strong>ess <strong>in</strong> delivery and value for money has beenwell documented s<strong>in</strong>ce publication of these reports.Partner<strong>in</strong>g provides the conditions that can enable realcost sav<strong>in</strong>gs, elim<strong>in</strong>ate waste, encourage <strong>in</strong>novationand promote learn<strong>in</strong>g from experience. To capitaliseon these benefits, and deliver best value, the Councilreplaced its old price-based competitive tender<strong>in</strong>g with aquality-driven process us<strong>in</strong>g the New Eng<strong>in</strong>eer<strong>in</strong>gContract (NEC). Under this system, 26 contractorswere assessed through a 3-stage selection process thatevaluated experience, f<strong>in</strong>ancial stability, commitmentto health & safety, employee skills, and references fromclients, subcontractors and suppliers.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!