12.07.2015 Views

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Innovative Modern Methods of <strong>Construction</strong>Although the systems or products used <strong>in</strong> the schemehave been used before, the ma<strong>in</strong> <strong>in</strong>novation <strong>in</strong> this projectis that all the various design and construction approachesare brought together <strong>in</strong> a coherent, holistichous<strong>in</strong>g concept that was both susta<strong>in</strong>able and affordable.Prefabrication is a major factor <strong>in</strong> keep<strong>in</strong>g costs andwaste to a m<strong>in</strong>imum. Both the structural timber framesand bathroom pods are built off-site and delivered readyfor quick <strong>in</strong>stallation and connection.By us<strong>in</strong>g timber sourced from susta<strong>in</strong>able, managedforests for the build<strong>in</strong>g’s superstructure, the carbonfootpr<strong>in</strong>t of the build is reduced by 30%. M<strong>in</strong>imisationof construction impacts have been achieved by theconstruction contractor through a variety of measures<strong>in</strong>clud<strong>in</strong>g site utility monitor<strong>in</strong>g, with targets forelectricity and water, a construction site wastemanagement plan, use of reusable hoard<strong>in</strong>gs and‘eco-cab<strong>in</strong>s’ for onsite accommodation.<strong>Construction</strong> was far ahead of schedule due to theunexpectedly quick <strong>in</strong>sallations of the timber frames.Just <strong>in</strong> time (JIT) deliveries were fundamental toma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the construction programme. MMCrequired tighter, more reliable processes lead<strong>in</strong>g tothe adoption of lean pr<strong>in</strong>ciples. Standardisation of thef<strong>in</strong>ish<strong>in</strong>g processes brought benefit to the supply cha<strong>in</strong>,reduc<strong>in</strong>g wastage of materials on site as well as wastedoperations.Panelised timber frame construction was new to somemembers of the construction team, and sem<strong>in</strong>ars/project meet<strong>in</strong>gs were held at an early stage with thecontractor/supply cha<strong>in</strong> partners with regard to theprocess approach and construction technology <strong>in</strong>volved,both to give confidence and exchange knowledge.‘Toolbox talks’ were <strong>in</strong>itiated with the workforceof the various supply cha<strong>in</strong> partners to ensure requirementswere properly implemented on site. Many detaildesign or construction issues <strong>in</strong>corporated <strong>in</strong> the schemehave been adopted by supply cha<strong>in</strong> members as generalpractice mov<strong>in</strong>g forward.Innovative Methods and ToolsLancaster University recognises the significantenvironmental impacts associated with its operationsand also its responsibility to address these impacts <strong>in</strong>all areas of its activities through its Environmental Policyand Environmental Management System (EMS). Theenvironmental impact of new or refurbished build<strong>in</strong>gsis very carefully evaluated from conception, throughdesign and construction to operation. The County andGrizedale Eco-residences have a Build<strong>in</strong>g ManagementSystem (BMS) which constantly communicates utility useto enable the students to monitor their carbon footpr<strong>in</strong>tfor their townhouse which is calculated from its water,gas and electricity usage.A competition was launched <strong>in</strong> January 2009 topromote this function with the residents and motivate themto be more environmentally conscious. This was set-up <strong>in</strong>conjunction with GreenLancaster to promote and<strong>in</strong>centivise reduced energy and utilities use, andreward the townhouses with the lowest resultant carbonfootpr<strong>in</strong>t. Each townhouse has the opportunity to w<strong>in</strong>£600 per term which is the average cost of their utilitybill. Students can log onto the Green Lancaster websitehttp://www.greenlancaster.org.uk/carbon-competition/and view the carbon footpr<strong>in</strong>t and utility use for theirhouse <strong>in</strong> real-time, as well as check on who is w<strong>in</strong>n<strong>in</strong>g.Carbon emissions were reduced by 11.3% (or 16 tonnesCO2) for January-April 2009 compared with the sameperiod last year, when there was no carbon contest.Carbon emissions per person per day also dropped from3.54kg <strong>in</strong> 2008 to 3.14kg <strong>in</strong> 2009. Students achievedthese results by tak<strong>in</strong>g some simple actions such asswitch<strong>in</strong>g off the TV at the ma<strong>in</strong>s, not leave anyth<strong>in</strong>gon standby, half-fill<strong>in</strong>g the kettle, cook<strong>in</strong>g together, andfill<strong>in</strong>g up the wash<strong>in</strong>g up bowl <strong>in</strong>stead of runn<strong>in</strong>g thetap.INNOVATIVE ACHIEVEMENTSSignificant f<strong>in</strong>ancial and environmental benefits havebeen achieved for both the University and studentresidents <strong>in</strong> the County and Grizedale developments.n The cost was decreased from £32,000 to £29,830 perstudent room <strong>in</strong> comparison to previous phase.n The rent charged to students had a 15% reductionaga<strong>in</strong>st the rental charges <strong>in</strong> previous phase.n The residences are anticipated to better CO2emission targets from the Build<strong>in</strong>g Regulations, withannual emissions of 963kg CO2/annum/studentaga<strong>in</strong>st design criteria which predicted emissions of1,147kg CO2/annum/student.n Gas consumption is anticipated to reduce by 5-10%per student room compared to the previous phase ofresidences.n U values of 0.26 W/m2 (walls), 0.135 W/m2 (Roof/Floor) and 1.1 W/m2 (w<strong>in</strong>dows/doors) have beenachieved.n The construction contractors are registered with the‘Considerate Contractors’ scheme, and achievedan audit score of 32 out of 40 <strong>in</strong> a ConsiderateContractors external audit.29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!