12.07.2015 Views

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

Innovation in Construction A Project Life Cycle Approach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.5 Case Study 4: Cheetham HillTesco Environmental FormatStoreTHE CONCEPTThis scheme is the first repeatable format to be builtfor Tesco, with the aim that this will become thestandard design format for future stores. The <strong>in</strong>novationsthat were achieved through the scheme have beenselected through design workshops and test<strong>in</strong>g dur<strong>in</strong>gthe procurement stages of the project. The successbeh<strong>in</strong>d the project lies <strong>in</strong> the collaborative work<strong>in</strong>g relationshipamong the project participants and commitment to<strong>in</strong>novation and meet<strong>in</strong>g project goals. Thecontractor’s (Taylor Woodrow) role <strong>in</strong> this project wascritical <strong>in</strong> ensur<strong>in</strong>g that the design team all workedtogether to deliver the clients aims. A mixture of newconstruction techniques were sought to deliver anenvironmentally friendly, energy efficient, susta<strong>in</strong>able,<strong>in</strong>novative, <strong>in</strong>tegrated, and value added project,whilst ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g customer and client satisfaction. Thescheme is the first supermarket to run on vegetableoil via a CHP unit that provides the energy and heatrequirements of the store. Examples of environmentallyfriendly <strong>in</strong>novations <strong>in</strong>clude a certified hybrid timberframe, susta<strong>in</strong>able cladd<strong>in</strong>g system, X-Lite roof lights,w<strong>in</strong>d catchers and clerestory glaz<strong>in</strong>g.INNOVATION JOURNEY/STORYInnovative Plann<strong>in</strong>gTaylor Woodrow has been partners with Tescos<strong>in</strong>ce 1985 when Tesco decided to form strategicalliances with its contractors. The key reason for strategicpartner<strong>in</strong>g for them was to cont<strong>in</strong>ue to <strong>in</strong>novate theirsupermarket build<strong>in</strong>gs, so that they would be built fasterfor less money and deliver high performance. Work<strong>in</strong>gtogether as a part of the team was the major enablerof <strong>in</strong>novation <strong>in</strong> this project. The team worked with B& K Timber Structures to supply timber frames. As oneof the only firms <strong>in</strong> the UK able to offer a completepackage of expertise <strong>in</strong> both steel and timber design,eng<strong>in</strong>eer<strong>in</strong>g, manufacture and <strong>in</strong>stallation, they wereable to undertake the project at Cheetham Hill withefficiency, ensur<strong>in</strong>g Tesco was <strong>in</strong> a position to commencetrad<strong>in</strong>g on schedule.Tesco is very successful at manag<strong>in</strong>g the <strong>in</strong>novationprocess through collaboration with their strategicpartners. Tesco has n<strong>in</strong>e contractors work<strong>in</strong>g withthem, all of which carry out R&D on their behalf. Thisdecentralised research approach br<strong>in</strong>gs mutual benefits;people hav<strong>in</strong>g specific expertise <strong>in</strong>vest <strong>in</strong> develop<strong>in</strong>gnew solutions for Tesco but the cont<strong>in</strong>uous(repeatable) nature of the projects encourages them to<strong>in</strong>novate and they benefit from the buy<strong>in</strong>g power of Tescoat the same time and learn from them on monitor<strong>in</strong>g theiroperations and manag<strong>in</strong>g the supply cha<strong>in</strong>. Tesco alsohas its own technology centre and a small non-tradeconcept store that is open to its partners to test theirideas <strong>in</strong>.Innovative Design and <strong>Construction</strong> Process<strong>Construction</strong> of the Eco-Store <strong>in</strong> Cheetham Hill wasbased on the pr<strong>in</strong>ciples of us<strong>in</strong>g wood <strong>in</strong>stead ofmetal; <strong>in</strong>troduc<strong>in</strong>g more natural daylight <strong>in</strong>to the storeto use less electricity; achiev<strong>in</strong>g a more energy-efficientheat<strong>in</strong>g and air-condition<strong>in</strong>g system; us<strong>in</strong>g less energyand water; generat<strong>in</strong>g our own energy; reth<strong>in</strong>k<strong>in</strong>grefrigeration, fixtures and signage; andm<strong>in</strong>imis<strong>in</strong>g waste; all of which contributesignificantly <strong>in</strong> cutt<strong>in</strong>g the store’s carbon footpr<strong>in</strong>t.The construction processes was similar to a standardTesco format store but the <strong>in</strong>novations below were<strong>in</strong>troduced <strong>in</strong> terms of products and processes:n Hybrid timber frame: One of the most importantelements of the environmentally friendly designfeatures is the <strong>in</strong>novative hybrid timber-steel structure.Through careful design detail<strong>in</strong>g and valueeng<strong>in</strong>eer<strong>in</strong>g, B & K Timber Structures <strong>in</strong>corporatetheir expertise <strong>in</strong> steelwork fabrication to offer hybridstructures. They comb<strong>in</strong>e the aesthetic andenvironmental benefits of timber with the economicbenefits of steel that reduce carbon footpr<strong>in</strong>t withoutcompromis<strong>in</strong>g quality.n Susta<strong>in</strong>able cladd<strong>in</strong>g system: The system wassourced from Lithuania and required a lot of detail<strong>in</strong>gand plann<strong>in</strong>g to execute a very smooth <strong>in</strong>stallationwithout any problems. It was manufactured off siteand offers an embedded/carbon energy sav<strong>in</strong>g of 8%and the cladd<strong>in</strong>g is 100% recyclable.n TriArch wall<strong>in</strong>g solution: This system is aprefabricated wall<strong>in</strong>g system, which is made fromrecycled gypsum and timber board<strong>in</strong>g. Thisproduct is 100% recyclable, there is no requirement forplaster<strong>in</strong>g as the system is pre-f<strong>in</strong>ished and ready foreither wall paper or pa<strong>in</strong>t f<strong>in</strong>ish that ultimately results<strong>in</strong> no wastage.33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!