13.07.2015 Views

Proposed Limpopo West Mine Concept Study ... - SRK Consulting

Proposed Limpopo West Mine Concept Study ... - SRK Consulting

Proposed Limpopo West Mine Concept Study ... - SRK Consulting

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SRK</strong> <strong>Consulting</strong>: 447493: <strong>Limpopo</strong> <strong>West</strong> Geochem Page 17<strong>Proposed</strong>PhasePhase 3.1Phase 3.2Size of<strong>Mine</strong>Mega<strong>Mine</strong>Mega<strong>Mine</strong>Area/FarmPropertyWelgelegen,Groenfontein,Grootwater,GeelbekpanDuikerfontein,Gannavlake,RingbultDepth ofMining (m)Run of<strong>Mine</strong>Capacity(Mtpa)TotalCapacity(Mtpa)145 45 45145 45 90<strong>Mine</strong> Residuedepositinterburden dumps toa maximum height of30 m.Overburden,Interburden, topsoiland beneficiationplant discards.Overburden andinterburden dumps toa maximum height of120 m.Overburden,Interburden, topsoiland beneficiationplant discards.Overburden andinterburden dumps toa maximum height of120 m.NotesAll 11 coalseams to beminedAll 11 coalseams to beminedDuring Phase 1 and Phase 2, open pit mining method will be used. This method will consist ofdrilling, blasting, loading and hauling of waste rock and coal. The waste rocks are to be placedoutside the pit on a demarcated overburden stockpile areas, and the Run of <strong>Mine</strong> (ROM) coal is tobe delivered to the primary crushing circuit of the process plant. Phase 1 will make use of articulateddump trucks and hydraulic excavators together with auxiliary equipment for road maintenance, floorheight control and waste dump management. Phase 2 will mainly make use of large scaleequipment.The Mega <strong>Mine</strong> phases, Phase 3.1 and 3.2, which covers all nine farms in the complex, includingdeeper mining of the Phase 1 and 2 pit will make use of in-pit crushing approach. This approach ismainly used during these phases due to the large extent of the area to be mined. Four streams ofROM will be generated using five in pit crushing and conveying systems.Based on the understanding of the geological material collected during the Sasol Mafutha Project(<strong>SRK</strong>, 2011) and previous studies in the Waterberg Coalfield (Bester and Vermeulen, 2010) thetypes of material that will be disturbed, exposed and/or deposited during the mining is presented inTable 2-2.Table 2-2: Types of materials expected from the mining of coalSource Material Type DescriptionROM StockpileDiscardOverburdenInterburdenOpen pit and In pitcrushingCoalCoal processing residuesWeathered material consisting ofconglomerate, sand and mudstoneMudstone, coal shale, coal, sandstoneMudstone, coal shale, coal, sandstoneRolling stockpile consisting of coalmaterialResidues material from coalprocessing that be disposed onto adiscard dumpResidue material that will make upthe overburden waste stockpileResidue material that will make upinterburden waste stockpileThe material that will be exposed inthe walls and base of the pit. Similarto those constituting the from theoverburden, interburden and coalstockpiles.GOGP/LAKJ Report_April2013_19April2013 (1)_Final_Ludi_22052013 April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!