- Page 2 and 3:
FUSION FOR ENERGYAnnual ActivityRep
- Page 4 and 5:
CHAPTERTITLEPAGE45Remote Handling 3
- Page 6 and 7:
ANNEXTITLEPAGEVVIVIIVIII2009 Balanc
- Page 8 and 9:
List of AcronymsA/EAASCATOBABAUABSM
- Page 10 and 11:
RHRMPRU-DARWMSCSDCSHPCSNUSTACSTCSTP
- Page 12 and 13:
I am very pleased to introduce the
- Page 14 and 15:
At the ITER site in Cadarache, the
- Page 16:
I would like to begin by acknowledg
- Page 19 and 20:
CHAPTER 1Fusion for EnergyThe Europ
- Page 23 and 24:
CHAPTER 2Introduction to FusionFusi
- Page 25 and 26:
Procurement SharingTo ensure a fair
- Page 28 and 29:
FUSION FOR ENERGYChapter 3MainAchie
- Page 30 and 31:
Ancilliary Systems··Vacuum Pumpin
- Page 32 and 33:
An aerial view of the ITER construc
- Page 34 and 35:
ITER Director-General, Kaname Ikeda
- Page 36 and 37:
European fusion research laboratori
- Page 38 and 39:
signature to ITER IO. In 2009 F4E r
- Page 40 and 41:
completion of details. The structur
- Page 42 and 43:
to a position to start one of its m
- Page 44:
mechanical properties are investiga
- Page 47 and 48:
CHAPTER 4Contracts andProcurementPr
- Page 49 and 50:
Export ControlF4E participated in t
- Page 51 and 52:
Training and StudentshipsA Strategi
- Page 53 and 54:
Time to process a payment vs. numbe
- Page 55 and 56:
ICS N ° Internal Control Standard
- Page 57 and 58:
Overall F4E Process MapData Protect
- Page 59 and 60:
CHAPTER 4Infrastructureand Logistic
- Page 61 and 62:
(Assembly of Agency Staff Committee
- Page 63 and 64: H.M. King Carl XVI Gustaf of Sweden
- Page 66 and 67: FUSION FOR ENERGYChapter 5Statutory
- Page 68 and 69: Summary of Decisions9 th Governing
- Page 70 and 71: CHAPTER 5Executive CommitteeThe Exe
- Page 72: FUSION FOR ENERGYAnnex IImplementat
- Page 75 and 76: Broader Approach Procurement Arrang
- Page 77 and 78: BlanketWork Programme 2008 - Awarde
- Page 79 and 80: Remote HandlingWork Programme 2008
- Page 81 and 82: Electron Cyclotron Power Sources an
- Page 83 and 84: Site and BuildingsWork Programme 20
- Page 86 and 87: Plasma EngineeringWork Programme 20
- Page 88 and 89: Work Programme 2009 - AwardedContra
- Page 90 and 91: ITER Task AgreementsTask NumberTA T
- Page 92 and 93: 030 ITER/C4N/09/67/PB031 ITER/C4N/0
- Page 94: FUSION FOR ENERGYAnnex IICompositio
- Page 97 and 98: COMPOSITIONAd-Hoc Groupsthe Working
- Page 99 and 100: COMPOSITIONTechnical Advisory Panel
- Page 102: 31 December 2009ORGANISATIONDirecto
- Page 105 and 106: Safety GroupWerner GuldenLorenzo Pe
- Page 107: IT Systems GroupThomas Bousios*Jord
- Page 111 and 112: Negotiated ProceduresOperational Bu
- Page 113: Activity AreaTitleAmount(in EUR)Ben
- Page 117 and 118: Financial Year 2009Implementation o
- Page 119 and 120: 2009Balance Sheet (Assets)ASSETS 31
- Page 121 and 122: 2009Economic Outturn Account2009 20
- Page 123 and 124: 2009Establishment Plan2009gradeAuth
- Page 125 and 126: CHAPTER 1124
- Page 127 and 128: 126
- Page 129 and 130: 128
- Page 131 and 132: Nationality Breakdown - All StaffNa
- Page 133 and 134: 132
- Page 135 and 136: 134
- Page 137 and 138: 136
- Page 139 and 140: CHAPTER 1138
- Page 141: Europe Direct is a service to help