13.07.2015 Views

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Work Programme <strong>2009</strong> - AwardedContract ReferenceContract DescriptionTime of Call(<strong>For</strong>eseen)Time of Call(Actual)Award Date<strong>F4E</strong>-<strong>2009</strong>-GRT-032-01(PMS-H.CD)<strong>F4E</strong>-<strong>2009</strong>-OPE-032-01(PMS-H.CD)<strong>F4E</strong>-<strong>2009</strong>-GRT-022-01(PMS-H.CD)Components and Infrastructure of the NBTF (incl.design of cryopumps)Experiment on a Large RF Ion Source with Extraction(ELISE)Neutral Beam Injector HNB1 & HNB2 DevelopmentSupport for Components Outside the Scopeof NBI Test facilityQ2 <strong>2009</strong> 08/06/<strong>2009</strong> 04/11/<strong>2009</strong>Q2 <strong>2009</strong> 20/04/<strong>2009</strong> 14/09/<strong>2009</strong>Q1 <strong>2009</strong> 23/01/<strong>2009</strong> 25/11/<strong>2009</strong>Work Programme <strong>2009</strong> - LaunchedContract ReferenceContract DescriptionTime of Call(<strong>For</strong>eseen)Time of Call(Actual)<strong>F4E</strong>-OPE-046 Ion source test facility (power supplies - ISEPS) Q3 <strong>2009</strong> Q3 <strong>2009</strong>DiagnosticsWork Programme 2008 - AwardedAgreementReferenceAgreement DescriptionTime of Call(<strong>For</strong>eseen)Time of Call(Actual)Award Date<strong>F4E</strong>-2008-GRT-012(PMS-DG)Magnetics diagnostics Q4 2008 11/08/2008 16/03/<strong>2009</strong>Work Programme <strong>2009</strong> - AwardedAgreementReferenceAgreement DescriptionTime of Call(<strong>For</strong>eseen)Time of Call(Actual)Award Date<strong>F4E</strong>-<strong>2009</strong>-GRT-024-01(PMS-DG) ACTION 1<strong>F4E</strong>-<strong>2009</strong>-GRT-024-02(PMS-DG) ACTION 2<strong>F4E</strong>-<strong>2009</strong>-GRT-047(PMS-DG) Tasks 1-3ACTION 1 - Detailed design of a representativeequatorial port plugACTION 2 -Equatorial port plug diagnostic integrationanalysisSystem-level optimisation of the ITER MagneticsDiagnostic and R&D/Design of magnetic sensorsassemblies – Part A - Subtasks 1-3Q1 <strong>2009</strong> 02/02/<strong>2009</strong> 28/07/<strong>2009</strong>Q1 <strong>2009</strong> 02/02/<strong>2009</strong> 18/12/<strong>2009</strong>Q3 <strong>2009</strong> 29/09/<strong>2009</strong> 18/12/<strong>2009</strong>81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!