13.07.2015 Views

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ITER Task AgreementsTask NumberTA Title<strong>F4E</strong> SignatureDateIO SignatureDateValue ITERCreditC51TD37FE ITER IC Antenna R&D programme: Faraday Shield 12/12/2008 15/12/2008 EUR 740 kC51TD38FE ITER IC Antenna R&D programme: Vacuum Window 12/12/2008 15/12/2008 EUR 990 kC51TD39FEITER IC Antenna R&D programme: Explosion of AntennaLow Power Mock-up12/12/2008 15/12/2008 EUR 225 kC53PP42FE Design activities for ITER Neutral Beam Injector 12/12/2008 12/01/<strong>2009</strong> 1870 IUAC53PP37FEDevelopment of codes for applications in the ITERNB&DNB injectors (5.3EU3)12/12/2008 12/01/<strong>2009</strong> 1 ppyC16PP141FE BLANKET EM BENCHMARKING ANALYSES 05/03/<strong>2009</strong> 23/03/<strong>2009</strong> 250 IUAC23PP47FE In-vessel viewing system (IVVS) conceptual design 22/04/<strong>2009</strong> 18/05/<strong>2009</strong> 1000 IUAC81TD36FE Detailed Analyses of Reference Event Scenarios (2) 09/07/<strong>2009</strong> 17/08/<strong>2009</strong> 0.25 k IUAC52PP36FEC53TD52FEC55TD29FEC23PP48FEC53TD55FEC55TD31FEC52TD37FEC76TD07FEC31TD16FEC31TD17FEPreparation work for gyrotron integration and for theassociated Procurement ArrangementDesign of the components for the neutral beamsystemGeneric Diagnostic Equatorial Port Plug PreliminaryDesignCash and Plug Remote Handling System (CPRHS) designrelated activities: air transfer system conceptualdesign and requirement definitionNeutral Beam Injector HNB1 & HNB2 DevelopmentSupport for Components Outside the Scope of NBI TestFacilityDetailed Design, prototyping and testing of ex-vesselmagnetic sensors for ITERPreparation work for the Procurement Arrangementfor EC power supply systemElectro-Magnetic Analysis and Mechanical LoadsAnalysis for TBM Port Plug Frame Conceptual DesignITER Vacuum System: Updating and completion of thedesign of the Pre-Production CryopumpITER Vacuum System: Installation, Commissioning andtest campaign of the Pre-Production Cryopump16/07/<strong>2009</strong> 17/08/<strong>2009</strong> 2ppy22/07/<strong>2009</strong> 17/08/<strong>2009</strong> 1749 IUA17/09/<strong>2009</strong> 01/10/<strong>2009</strong> 150 IUA18/09/<strong>2009</strong> 01/11/<strong>2009</strong> 3 ppy01/10/<strong>2009</strong> 23/10/<strong>2009</strong> 1293 IUA08/10/<strong>2009</strong> 23/10/<strong>2009</strong> 101 IUA14/10/<strong>2009</strong> 27/10/<strong>2009</strong> 67 IUA.23/10/<strong>2009</strong> 09/11/<strong>2009</strong> 45.04 IUA06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 133 IUA06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 227 IUAC53TD56FE Design of the NBTF Components 06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 1940 IUAC11TD178FE Eddy Current Analysis of the Magnet Structures 17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 160 IUAC11TD179FEC16TD144FEAnalysis of the error fields induced in the magnetsystem of ITERFirst Wall Blanket Panel Manufacturing Cost Assessmentof Enhanced Heat Flux v Low Heat FluxTechnology (EU)17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 100 IUA17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 30 IUA89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!