ITER Task AgreementsTask NumberTA Title<strong>F4E</strong> SignatureDateIO SignatureDateValue ITERCreditC51TD37FE ITER IC Antenna R&D programme: Faraday Shield 12/12/2008 15/12/2008 EUR 740 kC51TD38FE ITER IC Antenna R&D programme: Vacuum Window 12/12/2008 15/12/2008 EUR 990 kC51TD39FEITER IC Antenna R&D programme: Explosion of AntennaLow Power Mock-up12/12/2008 15/12/2008 EUR 225 kC53PP42FE Design activities for ITER Neutral Beam Injector 12/12/2008 12/01/<strong>2009</strong> 1870 IUAC53PP37FEDevelopment of codes for applications in the ITERNB&DNB injectors (5.3EU3)12/12/2008 12/01/<strong>2009</strong> 1 ppyC16PP141FE BLANKET EM BENCHMARKING ANALYSES 05/03/<strong>2009</strong> 23/03/<strong>2009</strong> 250 IUAC23PP47FE In-vessel viewing system (IVVS) conceptual design 22/04/<strong>2009</strong> 18/05/<strong>2009</strong> 1000 IUAC81TD36FE Detailed Analyses of Reference Event Scenarios (2) 09/07/<strong>2009</strong> 17/08/<strong>2009</strong> 0.25 k IUAC52PP36FEC53TD52FEC55TD29FEC23PP48FEC53TD55FEC55TD31FEC52TD37FEC76TD07FEC31TD16FEC31TD17FEPreparation work for gyrotron integration and for theassociated Procurement ArrangementDesign of the components for the neutral beamsystemGeneric Diagnostic Equatorial Port Plug PreliminaryDesignCash and Plug Remote Handling System (CPRHS) designrelated activities: air transfer system conceptualdesign and requirement definitionNeutral Beam Injector HNB1 & HNB2 DevelopmentSupport for Components Outside the Scope of NBI TestFacilityDetailed Design, prototyping and testing of ex-vesselmagnetic sensors for ITERPreparation work for the Procurement Arrangementfor EC power supply systemElectro-Magnetic Analysis and Mechanical LoadsAnalysis for TBM Port Plug Frame Conceptual DesignITER Vacuum System: Updating and completion of thedesign of the Pre-Production CryopumpITER Vacuum System: Installation, Commissioning andtest campaign of the Pre-Production Cryopump16/07/<strong>2009</strong> 17/08/<strong>2009</strong> 2ppy22/07/<strong>2009</strong> 17/08/<strong>2009</strong> 1749 IUA17/09/<strong>2009</strong> 01/10/<strong>2009</strong> 150 IUA18/09/<strong>2009</strong> 01/11/<strong>2009</strong> 3 ppy01/10/<strong>2009</strong> 23/10/<strong>2009</strong> 1293 IUA08/10/<strong>2009</strong> 23/10/<strong>2009</strong> 101 IUA14/10/<strong>2009</strong> 27/10/<strong>2009</strong> 67 IUA.23/10/<strong>2009</strong> 09/11/<strong>2009</strong> 45.04 IUA06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 133 IUA06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 227 IUAC53TD56FE Design of the NBTF Components 06/11/<strong>2009</strong> 18/11/<strong>2009</strong> 1940 IUAC11TD178FE Eddy Current Analysis of the Magnet Structures 17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 160 IUAC11TD179FEC16TD144FEAnalysis of the error fields induced in the magnetsystem of ITERFirst Wall Blanket Panel Manufacturing Cost Assessmentof Enhanced Heat Flux v Low Heat FluxTechnology (EU)17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 100 IUA17/11/<strong>2009</strong> 25/11/<strong>2009</strong> 30 IUA89