13.07.2015 Views

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

F4E Annual Report 2009 - Fusion For Energy - Europa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

030 ITER/C4N/09/67/PB031 ITER/C4N/09/74/BEY032 ITER/C4N/09/73/OLT033 ITER/C4N/09/79/OKA034 ITER/C4N/09/77/OKA035 ITER/C4N/09/4300000007QA/QC (Quality Assurance/Quality Control) Services for Electrical, PowerConversion and Power Electronics ComponentsFramework Contract for Central Interlock and Safety (I&S) SystemsEngineering ServicesContract for CODAC (Control, Data Access and Communication System)Core Software Engineering SupportDevelopment of High Voltage Instrumentation Feedthroughs for the ITERSuperconducting Magnet SystemsR&D Contract for Assessment of Tritium Removal from Co-DepositedBeryllium Layers by Flash HeatingConceptual Design of the Five Auxiliaries Cold Boxes (ACB), the ColdCompressor Box (CCB), the Thermal Shield Cooling System (TSCS) ofITER Project04/05/<strong>2009</strong>15/05/<strong>2009</strong>15/05/<strong>2009</strong>19/06/<strong>2009</strong>24/06/<strong>2009</strong>13/07/<strong>2009</strong>036 ITER/C4N/09/80/IJ Global Insurance Programme for Construction and Erection 16/07/<strong>2009</strong>037 ITER/RT/09/82/PMT Cryoscope IV Studies and Analysis Work for the ITER Cryogenic System 23/07/<strong>2009</strong>038 ITER/C4N/09/84/GOI039 ITER/C4N/09/1378Research and Development - Absolute Valve - Prefeasibility Study for theDesign, Test Programme and Equipment RequiredDevelopment and Qualification of Productive Welding Technology forApplication to In-Situ Assembly Welds05/08/<strong>2009</strong>19/08/<strong>2009</strong>040 ITER/C4N/09/87 Product Lifecycle Management (PLM) System 25/08/<strong>2009</strong>041 ITER/C4N/09/90/PMTDevelopment of Method for Highly Tritiated Water Handling in ITERTritium Plant Phase 101/09/<strong>2009</strong>042 ITER/C4N/09/088/LCN People Management Training 10/09/<strong>2009</strong>043 ITER/C4N/09/1542/MMESimulation Studies to be Performed Describing Water Flow ThroughCrevices and Water Spatial Pressure Evolution Around ITER First WallBlanket Shielding Modules29/09/<strong>2009</strong>044 ITER/C4N/09/91/OKA Third Part Inspection of Mechanical Structures, Systems and Components 06/10/<strong>2009</strong>045 ITER/C4N/09/92/OKA The Development of the ITER Process Quality Management System 06/10/<strong>2009</strong>046 ITER/C4N/09/10001559047 ITER/C4N/09/1137/OKACryogenic, Electrical and Mechanical Tests of High Voltage Equipment forthe ITER Magnet SystemsDetailed Design and Integration of Tritium Plant Building Layout andSub-Systems05/10/<strong>2009</strong>13/10/<strong>2009</strong>048 ITER/C4N/09/95 Provision of Support Services for Procurement and Contract Division 16/10/<strong>2009</strong>049 ITER/C4N/09/96/MME Spectroscopic Method of Water Leak Micro-Leak Localisation 23/10/<strong>2009</strong>050 ITER/C4N/09/94/PBS SAP Application Maintenance Service 27/10/<strong>2009</strong>051 ITER/C4N/09/1738/RMTSInstrumentation and Control Technology Integration Support 16/11/<strong>2009</strong>052 ITER/CFT/09/97/OLT Prototyping Safety Control System 19/11/<strong>2009</strong>053 ITER/CFT/09/98/OLT Prototyping Interlock Control System 19/11/<strong>2009</strong>054 ITER/C4N/09/1822/RTS055 ITER/C4N/09/1823/RTSIntegration of TBS Components in TBM Cryostat Interspace and Port CellAreas and Associated Assembly/Maintenance Operation Sequences IN-Situ and in the Hot Cell Facility, including Required TransportDesign of Interfaces between Test Blanket Systems (TBSs) and ITERTokamak Complex27/11/<strong>2009</strong>04/12/<strong>2009</strong>056 ITER/C4N/09/102/RTS Design and Implementation of an Integrated Modelling Infrastructure 24/12/<strong>2009</strong>91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!