13.07.2015 Views

Installation And Servicing Instructions - Heatingspares247.com

Installation And Servicing Instructions - Heatingspares247.com

Installation And Servicing Instructions - Heatingspares247.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WD209/1/2000 Chapter 1 : General Instruction The Keston Celsius 25 & 25PFig. 1.2 - Boiler LayoutThe condensate is very slightly acidic (about the same acidity as vinegar) and should bepiped in a plastic pipe. It is not harmful to the waste disposal system and may bedisposed of as normal waste water.The flue gases are piped in a 50 mm muPVC (BS5255) plastic pipe to the outside. Thetemperature of the flue gases are usually around 5 o C above the temperature of the returnwater. The flue pipe should be terminated outside the building from where they cannotre-enter the building or any other adjacent building.The heating level may be controlled by room thermostats, hot water calorifierthermostats, programmer time clocks and energy management systems.The Celsius 25 features an integral frost protection function which will fire the boiler,regardless of the external controls, should the boiler temperature fall below 4 O C. Theboiler will continue to fire until the boiler flow temperature exceeds 15 O C. This is to avoiddamage to the boiler through freezing of boiler water.The Celsius 25 features an integral pump/fan exercise function which will run the fan andpump, without firing the boiler, for 5 seconds in the event the boiler is on standby for inexcess of 24 hours without firing. This is to help prevent seizing of fan and/or pump dueto long periods of inactivity.1.3 RELATED DOCUMENTSThe Keston Celsius 25 Condensing Boiler must be installed in accordance with thecurrent issue of the Gas Safety (<strong>Installation</strong> and Use) Regulations 1996, current IEEWiring Regulations, Building Regulations, Building Standards (Scotland) Consolidation,and the Bye Laws of the local Water Undertaking.In addition, due account must be taken to the following Codes Of Practice:BS 6891 : Gas SuppliesBS 6798 : <strong>Installation</strong> Central Heating BoilersBS 5449 : <strong>Installation</strong> Pumped Central HeatingBS 5546 : <strong>Installation</strong> Domestic Hot Water<strong>Installation</strong> & <strong>Servicing</strong> <strong>Instructions</strong> Page : 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!