13.07.2015 Views

Installation And Servicing Instructions - Heatingspares247.com

Installation And Servicing Instructions - Heatingspares247.com

Installation And Servicing Instructions - Heatingspares247.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WD209/1/2000 Chapter 1 : General Instruction The Keston Celsius 25 & 25PKeston Boilers Ltd declare that there are no substances harmful to health within theappliance or used during the production of the appliance.The Celsius 25 is intended for domestic and commercial EMC environments and on agoverned G20 meter supply.The Celsius 25P is intended for domestic and commercial EMC environments and on agoverned G31 supply.IMPORTANTThis product contains ceramic fibre boards, which although not regarded as a risk, containceramic fibre which may cause temporary irritation to eyes, skin and respiratory tract. Thefibres are held in place by inorganic binders. Therefore as long as the boards are notdisturbed they will not be released. Since the boards are non-servicable parts there shouldbe no risk.However, in the event these boards are removed care must be taken when handling toensure the release of dust or fibres is kept to a minimum. Protective clothing is notrequired but it is recommended that gloves are worn and that hands are washed beforeeating or drinking after handling the boards. To keep the release of dust or fibres to aminimum it is recommended that a HEPA filtered vacuum is used to remove any debrisfrom within the appliance. It is recommended that any replaced boards are sealed withinheavy duty plastic bags and labelled “RCF Waste”. This may be disposed of at a tippingsite licensed for the disposal of industrial waste.BENCHMARK INITIATIVEAs part of the industry wide “Benchmark” Initiative all Celsius 25boilers now include a Benchmark <strong>Installation</strong>, Commissioning andService Record Log Book. Please read this carefully and completeall sections relevant to the appliance installation. The details of the Log Book will be required inthe event of and warranty work being required. There is also a section to be completed after eachregular service visit. The completed Log Book should be left with the customer.CORGI CONTACT INFORMATIONThe boiler should be installed and serviced only by CORGI registered operatives. All CORGIregistered Installers carry a CORGI ID cad, and have a registration number. Both should berecorded in the Benchmark Log Book. You can call CORGI direct on 01256 372300.1.5 OPTIONAL ACCESSORIESA range of accessories are available from Keston Boilers Ltd to compliment an installation.Terminal wall dealing collars are available to make good the external all face whilst working fromthe inside of the building. Stand-off frames are available to leave a 50mm gap behind the boiler toallow routing of pipes behind the boiler. A sealed system kit is available to mount below the boileras an extension to the cabinet and convert the boiler to a "system" boiler incorporating 8 litreexpansion vessel and 3 bar safety valve.DescriptionFlue Terminal Wall Sealing CollarAir Terminal Wall Sealing CollarSealed System KitStand Off Back Plate (Boiler only)Stand Off Back Plate (Boiler + Sealed System Kit)Part NumberC.08.0.00.07.0C.08.0.00.07.0C.08.0.02.00.0C.08.0.03.00.0C.08.0.05.00.0<strong>Installation</strong> & <strong>Servicing</strong> <strong>Instructions</strong> Page : 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!