- Page 1: SITE CHARACTERISATIONSTUDY - PHASES
- Page 5 and 6: - 3 -PREFACEIn keeping with our pol
- Page 7 and 8: - 5 -ABSTRACTIn response to recomme
- Page 9 and 10: - 7 -CONTENTSTitle Page 1PREFACE 3F
- Page 11 and 12: - 9 -4.5.4 Trial Site H 284.6 Final
- Page 13 and 14: - 11 -participating contractors for
- Page 15 and 16: - 13 -are a satisfactory method of
- Page 17 and 18: - 15 -squared fresh to slightly dec
- Page 19 and 20: - 17 -method. The feasibility of us
- Page 21 and 22: - 19 -The sonic method in the form
- Page 23 and 24: - 21 -4.23 Trial Site F - Wall adja
- Page 25 and 26: - 23 -The GEO provided access at ea
- Page 27 and 28: - 25 -were essentially horizontal.
- Page 29 and 30: - 27 -4.5 Comparison Of Preliminary
- Page 31 and 32: - 29 -4.6 Final InterpretationFinal
- Page 33 and 34: - 31 -Enpack (1997 d ). Ground Inve
- Page 35: - 33 -FigureNo.PageNo.21 Comparison
- Page 50 and 51: - 48 -
- Page 52 and 53:
- 50 -
- Page 57 and 58:
- 55 -
- Page 59:
- 57 -LIST OF PLATRSPlateNo.PageNo.
- Page 65:
- 63 -
- Page 70 and 71:
- 68 -
- Page 72 and 73:
- 70 -CONTENTSCONTENTS 70A.1 OBJECT
- Page 74 and 75:
- 72 -(a) Desk study, including aer
- Page 76 and 77:
- 74 -Other techniques which may wa
- Page 78 and 79:
- 76 -A.1G RESOURCESThe preliminary
- Page 80 and 81:
- 78 -CONTENTSPageNo.CONTENTS78B.I
- Page 82 and 83:
- 80 -B.I T ,AND-RASED ENGINEERING
- Page 84 and 85:
- 82 -thickness was not successful,
- Page 86 and 87:
- 84 -The reference list in Section
- Page 88 and 89:
- 86 -Resistivity methods may be us
- Page 90 and 91:
B.2.4.3 Time-Domain FJecfromagnetfe
- Page 92 and 93:
- 90 -B3 CONCLUSIONSThe main conclu
- Page 94 and 95:
- 92 -Colley, G.C. (1962). The dete
- Page 96 and 97:
- 94 -Matthews, M.C., Hope, V.S., C
- Page 98 and 99:
- 96 -Ward, S.H. (1990). nontechnic
- Page 100 and 101:
- 98 -Duval, J.S. (1989). Radioacti
- Page 102 and 103:
- 100 -Johnston, M.A. & Carpenter,
- Page 104 and 105:
- 102 -Roberts, R., Daniels, JJ. &
- Page 106:
- 104 -LIST OF TABLESTableNo.p a g
- Page 112 and 113:
- 110 -TJST OF FIGURESFigureNo.Page
- Page 114 and 115:
- 112 -
- Page 116 and 117:
- 114 -
- Page 118 and 119:
- 116 -
- Page 120 and 121:
- 118 -CONTENTSPageNo.CONTENTS 118C
- Page 122 and 123:
- 120 -be found in the contractor's
- Page 124 and 125:
- 122 -Institute of Geophysical and
- Page 126 and 127:
- 124 -TableNo.PageNo.C17 Contracto
- Page 128 and 129:
- 126 -Table C2 - Field Records - P
- Page 130 and 131:
- 128 -Table C4 - Field Records - P
- Page 132 and 133:
- 130 -Table C6 - Field Records - P
- Page 134 and 135:
- 132 -Table C8 - Field Records - P
- Page 136 and 137:
- 134 -Table CIO - Field Records -
- Page 138 and 139:
- 136 -Table C12 - Field Records -
- Page 140 and 141:
- 138 -Table C14 - Field Records -
- Page 142 and 143:
- 140 -Table C16 - Field Records -
- Page 144 and 145:
- 142 -Table C18 - Field Records -
- Page 146 and 147:
. 144 -Table C20 - Field Records -
- Page 148 and 149:
- 146 -Table C22 - Field Records -
- Page 150 and 151:
- 148 -CONTENTSPageNo.CONTENTS 148D
- Page 152 and 153:
- 150 -D.I HIGH RESOLUTION SEISMIC
- Page 154 and 155:
- 152 -normally constructed based o
- Page 156 and 157:
- 154 -The technique has the abilit
- Page 158 and 159:
- 156 -(ii) TA04. All five profiles
- Page 160 and 161:
- 158 -Very little data processing
- Page 162 and 163:
- 160 -levels, ranges, sampling int
- Page 164 and 165:
- 162 -D.7.2 Assessment of the Meth
- Page 166 and 167:
- 164 -Table Dl - Summary of Result
- Page 168 and 169:
- 166 -PlateNo.Pa § eNaDl 1 6kg sl
- Page 170 and 171:
- 168 -PlateNo.PageNo.D32 GSSI 500M
- Page 172 and 173:
- 170 -
- Page 174 and 175:
- 172 -
- Page 176 and 177:
- 174 -
- Page 178 and 179:
- 176 -
- Page 180 and 181:
- 178 -
- Page 182:
- 180 -
- Page 193 and 194:
191 -APPENDIX EDETAILED ASSESSMENT
- Page 195 and 196:
- 193 -E.I INTRODUCTIONGround penet
- Page 197 and 198:
- 195 -TE03 carried out by GA also
- Page 199 and 200:
- 197 -up by the EM-31 (Figure E8).
- Page 209 and 210:
file d:\29\6-il.26c Ur(«/s)H B 4B8
- Page 211 and 212:
(Superseded by Geospec 1)GCO Public
- Page 213 and 214:
Rainstorm Runoff on Slopes, by J. P
- Page 215 and 216:
Mineralogy and Fabric Characterizat
- Page 217 and 218:
Assessment of Geological Features R
- Page 219 and 220:
Investigation of Some Selected Land
- Page 221 and 222:
Yuen Long : Solid and Superficial G
- Page 223 and 224:
Tsuen Wan (Part): Solid & Superfici