- Page 1: SITE CHARACTERISATIONSTUDY - PHASES
- Page 4 and 5: - 2 -© The Government of the Hong
- Page 6 and 7: - 4 -FOREWORDThis report presents t
- Page 10 and 11: - 8 -3.3.6 Self Potential (SP) 173.
- Page 12 and 13: - 10 -1. INTRODUCTIONThe collapse o
- Page 14 and 15: - 12 -(v) Zones of enhanced moistur
- Page 16 and 17: - 14 -contrasts in electrical, dens
- Page 18 and 19: - 16 -A total of 4 drillholes and 1
- Page 20 and 21: - 18 -The time-domain electromagnet
- Page 22 and 23: - 20 -the GI data, final interpreta
- Page 24 and 25: - 22 -4.2.5 Trial Site H - Fill Slo
- Page 26 and 27: - 24 -4.4 Ground Investigation4,4.1
- Page 28 and 29: - 26 -Figure 19 shows the different
- Page 30 and 31: - 28 -estimate of wall thickness fr
- Page 32 and 33: - 30 -techniques and also to develo
- Page 34 and 35: - 32 -TIST OF FIGURESFigureNo.PageN
- Page 38: - 36 -
- Page 51 and 52: - 49 -
- Page 53: - 51 -
- Page 58 and 59:
- 56 -
- Page 63:
- 61 -
- Page 68:
- 66 -
- Page 71 and 72:
- 69 -APPENDIX ASITE CHARACTERISATI
- Page 73 and 74:
- 71 -A.I OBJECTIVETo assess the ca
- Page 75 and 76:
- 73 -to take a driven sample at th
- Page 77 and 78:
- 75 -A.8 PRELIMINARY THOUGHTS ON F
- Page 79 and 80:
- 77 -APPENDIX BGEOPHYSICS LITERATU
- Page 81 and 82:
- 79 -B.2.5.2 Case Histories 89B.2.
- Page 83 and 84:
- 81 -Acoustic P-wave velocity meas
- Page 85 and 86:
- 83 -a cut slope were successfully
- Page 87 and 88:
- 85 -Analysis of Surface Waves (SA
- Page 89 and 90:
- 87 -B.2.4.2 Frequency-Domain Elec
- Page 91 and 92:
- 89 -The depth of penetration of a
- Page 93 and 94:
- 91 -(vi) Ground Penetrating Radar
- Page 95 and 96:
- 93 -Hall, D.H. and Hajnal, Z. (19
- Page 97 and 98:
- 95 -Pullan, S.E. & Hunter, J.A. (
- Page 99 and 100:
- 97 -Butler, D. & Pedersen, E.P. (
- Page 101 and 102:
- 99 -Guenther, M. & Kathage, A.F.
- Page 103 and 104:
- 101 -Maynard, K.C. & Field, O.K.
- Page 105 and 106:
- 103 -Stokoe, K.H., Nazarian, S.,
- Page 111 and 112:
- 109 -Table B2 - A Summary of GPR
- Page 113 and 114:
- Ill -Figure Bl - Shallow Seismic
- Page 115 and 116:
- 113 -
- Page 117 and 118:
- 115 -
- Page 119 and 120:
- 117 -APPENDIX CPROFILES OF CONTRA
- Page 121 and 122:
- 119 -C.I PHASE 1 FIELD TRTATSBach
- Page 123 and 124:
- 121 -The Institute of Geophysical
- Page 125 and 126:
- 123 -LIST OF TABLESTableNo.PageNo
- Page 127 and 128:
- 125 -1. Main Contractor :Bachy So
- Page 129 and 130:
- 127 -Table C3 - Contractor Profil
- Page 131 and 132:
- 129 -1. Main Contractor :Guangdon
- Page 133 and 134:
- 131 -Table C7- Contractor Profile
- Page 135 and 136:
- 133 -1. Main Contractor:Meinhardt
- Page 137 and 138:
- 135 -Table Cl 1 - Contractor Prof
- Page 139 and 140:
- 13'1. Main Contractor:Golder Asso
- Page 141 and 142:
- 139 -1. Main Contractor:Bachy Sol
- Page 143 and 144:
- 141 -Table C17 - Contractor Profi
- Page 145 and 146:
- 143 -1. Main Contractor:Guangdong
- Page 147 and 148:
- 145 -Table C21 - Contractor Profi
- Page 149 and 150:
- 147 -APPENDIX DASSESSMENT OF THE
- Page 151 and 152:
- 149 -D.7 THERMAL IMAGING 161D.7.1
- Page 153 and 154:
- 151 -exception of TB04. Generally
- Page 155 and 156:
- 153 -(c) GSC present pseudo-dispe
- Page 157 and 158:
- 155 -interpretations of subsurfac
- Page 159 and 160:
- 157 -None of the contractors carr
- Page 161 and 162:
- 159 -D.5.2.2 Assessment of the MT
- Page 163 and 164:
- 161 -was generally used by all co
- Page 165 and 166:
- 163 -LIST OF TABLESTableNo.PageNo
- Page 167 and 168:
- 165 -LISTOFPT.ATF.SPlateNo.PageNo
- Page 169 and 170:
- 167 -plateNo.PageN aD2 1 Sting no
- Page 171 and 172:
- 169 -
- Page 173 and 174:
- 171 -
- Page 175 and 176:
- 173 -
- Page 177 and 178:
- 175 -
- Page 179 and 180:
- 177 -
- Page 181 and 182:
- 179 -
- Page 186:
- 184 -
- Page 194 and 195:
- 192 -CONTENTSPageNo.CONTENTS 192E
- Page 196 and 197:
- 194 -signal to improve the signal
- Page 198 and 199:
- 196 -well with the GPR results an
- Page 200:
- 198 -TXST OF FIGURESFigureNo.Page
- Page 210 and 211:
GEOTECHNICAL ENGINEERING OFFICE PUB
- Page 212 and 213:
Report on the Shum Wan Road Landsli
- Page 214 and 215:
Report on the Rainstorm of August 1
- Page 216 and 217:
Conventional and CRS Rowe Cell Cons
- Page 218 and 219:
Report on the Ching Cheung Road Lan
- Page 220 and 221:
Geology of the Western New Territor
- Page 222 and 223:
Shan Pui: Superficial Geology (1:5
- Page 224:
GE ° PUbHCati ° nS (eXCept Sheet